Skip to main content

Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns

Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th
August 19, 2016 Read time: 3 mins
Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades.

The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists.

All five routes join the M60 east of Manchester to the M1 north of Sheffield, with four options starting at the M67, and will see journeys cut by 30 minutes.

The tunnel could provide an economic boost to the two cities as well as the surrounding area. The link would help protect the environment by reducing traffic through the Peak District National Park, as well as support the government’s plan to build a Northern Powerhouse.

Intelligent transport systems will be used to provide monitoring systems, including incident detection systems to identify stopped vehicles on the approaches to, and inside, the tunnel, as well as CCTV systems to monitor activities on a stopped vehicle or an incident.

The new study reveals that driver behaviour is a key factor influencing the use of a long road tunnel. The government has undertaken an initial review of driver behaviour and perceptions when using tunnels and will carry out further research to help assess the impact of driver behaviour on a potential tunnel under the Pennines, for example by developing simulators to test driver responses.

The study cites research by Scandinavian research organisation SINTEF prior to construction of the Lærdal Tunnel in Norway which found the use of cavern spaces is one of the most effective ways to relieve travellers' fears and that the colours, lighting and patterns used in the tunnel help to mitigate the effects of claustrophobia, disorientation and tiredness. Similar solutions have been adopted in the Zhongnanshan Tunnel in China. Other options include using appropriate lane width, ventilation, tunnel width and curvature, and separation of carriageways.

The report recommends that the design considerations include a UK-based research project on driver behaviour in a long tunnel. Initial discussions have already been held with a number of potential providers, including Transport Research Laboratory.

Transport Minister John Hayes said: “I want people in the north of England to benefit from quicker, more reliable journeys. Today’s study brings us a step closer to building a Trans-Pennine roads tunnel – it would be the most ambitious project since the construction of the first motorways 50 years ago.”

Related Content

  • Transurban announces preferred contractor for NorthConnex
    March 18, 2014
    Melbourne-based toll-road operator Transurban Group has announced that the consortium Lend Lease Bouygues is set to design and build the Sydney, Australia, NorthConnex tunnel link between the M1 and M2 motorways in the city’s northwest. The nine kilometre, 80 km/h tolled link involves two motorway tunnels, built with a three lane capacity for future growth but initially marked for two lanes each way. It provides the missing link in the National Highway Network and offers a safe and more efficient way of
  • Making cars safer for vulnerable road users
    June 2, 2016
    Richard Cuerden considers measures to improve the safety of vulnerable road users. The competitive nature of the car market has seen an increase in protection for those travelling inside the vehicle and this is reflected in the casualty statistics -but the same does not apply to those outside the vehicle. And with current societal trends such as ageing populations, an increasing number of pedestrians and cyclists encouraged by environmental policies, this is an area that authorities such as the European Uni
  • A9 Safety Group wins prestigious road safety award
    June 12, 2015
    The A9 Safety Group in the UK has won the CIHT John Smart Road Safety Award, for a range of interventions along more than 200km of carriageway, including the implementation of 50 SPECS3 average speed cameras, supplied by Vysionics. The A9 SPECS3 installation has been in operation since October 2014, and is already delivering impressive changes to driver behaviour. Whilst it is still too early to report on casualty analysis, key performance indicators are already demonstrating that drivers have improved the
  • Innovia & The Ray feel the pulse
    March 15, 2022
    Getting drivers to slow down and space themselves safely on the road is a problem – but a collaboration between Innovia Technology and The Ray may have found a new way to do it