Skip to main content

Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns

Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th
August 19, 2016 Read time: 3 mins
Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades.

The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists.

All five routes join the M60 east of Manchester to the M1 north of Sheffield, with four options starting at the M67, and will see journeys cut by 30 minutes.

The tunnel could provide an economic boost to the two cities as well as the surrounding area. The link would help protect the environment by reducing traffic through the Peak District National Park, as well as support the government’s plan to build a Northern Powerhouse.

Intelligent transport systems will be used to provide monitoring systems, including incident detection systems to identify stopped vehicles on the approaches to, and inside, the tunnel, as well as CCTV systems to monitor activities on a stopped vehicle or an incident.

The new study reveals that driver behaviour is a key factor influencing the use of a long road tunnel. The government has undertaken an initial review of driver behaviour and perceptions when using tunnels and will carry out further research to help assess the impact of driver behaviour on a potential tunnel under the Pennines, for example by developing simulators to test driver responses.

The study cites research by Scandinavian research organisation SINTEF prior to construction of the Lærdal Tunnel in Norway which found the use of cavern spaces is one of the most effective ways to relieve travellers' fears and that the colours, lighting and patterns used in the tunnel help to mitigate the effects of claustrophobia, disorientation and tiredness. Similar solutions have been adopted in the Zhongnanshan Tunnel in China. Other options include using appropriate lane width, ventilation, tunnel width and curvature, and separation of carriageways.

The report recommends that the design considerations include a UK-based research project on driver behaviour in a long tunnel. Initial discussions have already been held with a number of potential providers, including Transport Research Laboratory.

Transport Minister John Hayes said: “I want people in the north of England to benefit from quicker, more reliable journeys. Today’s study brings us a step closer to building a Trans-Pennine roads tunnel – it would be the most ambitious project since the construction of the first motorways 50 years ago.”

Related Content

  • April 7, 2015
    Researchers helping to reduce New Zealand’s congestion
    Researchers at the University of Canterbury, New Zealand claim the impact of congestion in the country’s major cities could soon be greatly reduced. They are exploring how the movement of vehicles on New Zealand’s city roads can be more efficiently managed after accidents and breakdowns. University of Canterbury transport engineer Professor Alan Nicholson says their research shows drivers tend to divert off the motorway in large numbers only after a slow queue becomes visible. Along with Dr Glen Koorey and
  • November 10, 2014
    M25 upgraded to ‘smart’ motorway
    Road users on the vast majority of the UK’s M25 will benefit from four-lane capacity now that the final section between junctions 25 and 27 has become a smart motorway. The road has been upgraded from three to four lanes in each direction, with the hard shoulder converted for use as a permanent traffic lane and enhanced on-road technology to manage traffic flow to improve the reliability of journey times, providing a boost for businesses and the wider economy.
  • June 6, 2014
    Monitoring during construction reveals benefits of new expressway
    David Crawford reports on how the authorities in New Zealand are using Bluetooth technology to monitor the effects of a new expressway as it is being constructed. New Zealand Highway Agency (NZHA) is using Bluetooth-based vehicle detection to assess the impact of its biggest road building project as the various sections are completed. The large-scale deployment of a Bluetooth-based vehicle detection system is making substantial contributions to traffic data needs in progressing the new Waikato Expressway, a
  • July 23, 2015
    Over US$2.3 billion of investment awarded to upgrade motorways in England
    Highways England has appointed six joint-venture companies to design and build ten smart motorways across England as part of a US$2.3 billion investment. Three of these projects will start in autumn this year: two in the Midlands on the M1 J19 to J16 in Northamptonshire and the M5 J4a to J6 in Worcestershire, and one in the north-west on the M6 J16 to J19 near Stoke-on-Trent. The smart motorway schemes, part of the US$23 billion government investment Highways England is delivering between now and 2021