Skip to main content

Traffic flow information substantiates benefits of new route

The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012. Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.
August 20, 2012 Read time: 2 mins
The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012.

Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.

There has been a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16 per cent reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41 per cent reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16 per cent reduction in all vehicles and a 32 per cent reduction in HGVs.

CNDR has quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. The county council has already set aside additional capital funding to mitigate against this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

Related Content

  • Jenoptik cameras go live in Wales
    March 22, 2021
    Average speed camera scheme is designed to manage traffic congestion on M4
  • SWRI to supply regional ATMS across three states
    September 7, 2014
    Southwest Research Institute (SWRI), arrives at the ITS World Congress in celebratory mood after securing a five-year, $4.1 million contract. The deal will see SWRI develop a regional advanced transportation management system (ATMS), data hub and traveller information system (TIS) for the state transportation authorities in New Hampshire, Vermont and Maine. When implemented the system will upgrade the highway information infrastructure in northern New England and provide coordinated real-time traffic, safet
  • ADB to fund Jaipur metro extension
    May 30, 2014
    The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
  • Low-carbon mobility, one village at a time
    July 15, 2024
    Shantha Bloemen of Mobility for Africa, winner of this year's Movmi Empower Women in Shared Mobility Award, talks to Beate Kubitz about creative and practical solutions for transportation in the world’s rural areas – and why investment is still needed