Skip to main content

Traffic flow information substantiates benefits of new route

The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012. Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.
August 20, 2012 Read time: 2 mins
The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012.

Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.

There has been a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16 per cent reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41 per cent reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16 per cent reduction in all vehicles and a 32 per cent reduction in HGVs.

CNDR has quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. The county council has already set aside additional capital funding to mitigate against this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

Related Content

  • Making transportation systems safer and more sustainable with connectivity
    August 6, 2021
    Connectivity will make transportation systems safer and more sustainable as Anne-Lise Thieblemont of Qualcomm outlines
  • Work starts on more UK smart motorways
    July 9, 2014
    Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
  • Ramp metering delivers - again
    January 27, 2012
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to
  • Robust enforcement strategy needed for free flow toll roads
    January 10, 2012
    Timidity has no place in effective enforcement operations on free-flow toll roads, says the NRA's Cathal Masteron. What's needed is a robust strategy which starts big and reduces in size over time, rather than starts small and gains a reputation for being easy to avoid