Skip to main content

Traffic flow information substantiates benefits of new route

The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012. Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.
August 20, 2012 Read time: 2 mins
The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012.

Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.

There has been a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16 per cent reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41 per cent reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16 per cent reduction in all vehicles and a 32 per cent reduction in HGVs.

CNDR has quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. The county council has already set aside additional capital funding to mitigate against this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

Related Content

  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • European progress on road deaths 'disappointing', says ETSC
    June 18, 2020
    Safety body suggests that the EU will miss its target of halving fatalities by 2020
  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • Lorry levy a success after only four months
    August 15, 2014
    The HGV road user levy has made more than £17 million in the four months since it came into operation, says the UK Department for Transport. More than 618,000 levies have been purchased for over 112,000 vehicles from 76 different countries since the HGV road user levy was introduced in April 2014 – which has produced enough money to patch more than 320,000 potholes on the UK’s roads. Recent evidence shows over 95% of heavy goods vehicle operators are paying the new levy in Great Britain. Roadside chec