Skip to main content

Traffic flow information substantiates benefits of new route

The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012. Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.
August 20, 2012 Read time: 2 mins
The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012.

Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.

There has been a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16 per cent reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41 per cent reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16 per cent reduction in all vehicles and a 32 per cent reduction in HGVs.

CNDR has quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. The county council has already set aside additional capital funding to mitigate against this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

Related Content

  • City of Seattle implements SCOOT adaptive traffic management
    May 2, 2017
    Seattle Department of Transportation (SDOT) has implemented a new adaptive traffic control system at 32 intersections along Mercer Street between 3rd Ave W and I-5, which has been one of the city’s most congested corridors for over 40 years. Developed by the UK’s Transport Research Laboratory, the SCOOT (Split Cycle Offset Optimisation Technique) system coordinates the operation of the traffic signals in and around the corridor to help vehicles move more efficiently. SCOOT works in real-time to reduce delay
  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser
  • How safe are smart motorways?
    March 3, 2020
    A valiant attempt to ease the UK’s congested strategic road system? Or an idea that should never have seen the light of day? Alan Dron reports on the controversy over smart motorways...
  • Colorado congestion cure from Daktronics
    June 14, 2016
    Daktronics is here at ITS America 2016 San Jose to highlight an impressive array of dynamic message signs (DMS) and an equally impressive recent deployment. Ski traffic congestion in Colorado had become extremely challenging for Colorado DoT with traffic rushing out to the slopes on Fridays and hurrying home on Sundays. Rather than the time and cost of building a whole new road to keep travellers moving, CDoT brought an economical solution to life: the I-70 Mountain Express Lane.