Skip to main content

Traffic flow information substantiates benefits of new route

The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012. Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.
August 20, 2012 Read time: 2 mins
The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012.

Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.

There has been a marked reduction in both cars and HGVs along the main north to south arterial route through the city – the A7 and A595 – as an average of more than 10,000 vehicles a day use the new 8.25km/5.13-mile road.

Carlisle’s busiest stretch of road, the A595 at Castle Way, has shown a 16 per cent reduction in all vehicles from 38,083 a day before the opening of CNDR to 32,050 afterwards (with a 41 per cent reduction in HGVs from 6,860 to 4,060). Other city centre hotspots have shown similar reductions, with the A7 at Stanwix Bank showing a 16 per cent reduction in all vehicles and a 32 per cent reduction in HGVs.

CNDR has quickly become a key route to travel between the south west of the city and the industrial areas to the north - a big factor for employers looking to develop good communications channels in areas ripe for commercial development.

As expected, there are higher levels of traffic on certain radial routes that have direct links to the CNDR. The county council has already set aside additional capital funding to mitigate against this effect and also improve links to CNDR for pedestrians and cyclists along these radial routes.

Related Content

  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • April 9, 2014
    ITS homes in on cycling safety
    A new generation of ITS equipment is helping road authorities get to grips with cycle safety – and not a moment too soon as Colin Sowman discovers. Cyclists - remember them? Apparently not. At least not according to the OECD 2013 report Cycling, Health and Safety which contains the statement: ‘Cyclists are often forgotten in the design of the road traffic system’. Looking through the statistics that exist (each country appears to compile them differently) it is not difficult to see how such a conclusion cou
  • March 26, 2012
    Western Cape province targets road deaths
    South Africa’s Western Cape province has revealed plans to deploy technology – satellite trackers in all public transport vehicles, ANPR built into freeway cameras, and cameras at level crossings – in an attempt to reduce road deaths, according to a report by Independent Newspapers.
  • November 27, 2023
    Kapsch traffic management system debuts on Latvia highway
    Cameras, sensors and radar systems in operation on 'high-speed' Kekava Bypass