Skip to main content

Toshiba develops electric-powered bus with short charging time

Small buses owned by Tokyo's Minato Ward, in Japan, will be retrofitted by with new motors and lithium-ion cells developed by electronics major Toshiba. In fiscal 2013, the Ward aims to start full operations of the electric-powered buses and conduct pilot runs by end-fiscal 2012. The Ward intends to deploy the buses for short journeys in housing locations, as the buses need to be recharged after a trip about 12km in a bid to maintain the battery level higher than 50 per cent. At this level of battery status
May 1, 2012 Read time: 1 min
Small buses owned by Tokyo's Minato Ward, in Japan, will be retrofitted by with new motors and lithium-ion cells developed by electronics major 5392 Toshiba. In fiscal 2013, the Ward aims to start full operations of the electric-powered buses and conduct pilot runs by end-fiscal 2012.

The Ward intends to deploy the buses for short journeys in housing locations, as the buses need to be recharged after a trip about 12km in a bid to maintain the battery level higher than 50 per cent. At this level of battery status, the buses only require five minutes of charging time, which is a quarter of time needed with regular lithium-ion battery.

For more information on companies in this article

Related Content

  • New solutions to old problems set to cut emergency response times
    April 30, 2015
    David Crawford looks at the latest developments in emergency response. Ensuring speedier reactions to transport and travel crises is becoming increasingly important. US statistics suggest that as many as 1,000 ‘saveable’ lives can be lost each year in major cities because of operational defects in their SOS operations.
  • New EV chargers from ABB
    April 12, 2013
    Switzerland based ABB has launched the Terra SmartConnect (SC) fast chargers for electric vehicles (EV) in North America. Terra SC will be available with support for the CHAdeMO fast-charging standard, with SAE/combined charging system and will be made available in the Americas in second quarter of 2013. According to the company, the Terra SC can fully charge an electric car in thirty to 120 minutes and charge the battery of currently available EVs from 30 per cent to 80 per cent in about half an hour. The
  • Hyundai Heavy & Magna E-Car Systems to develop lithium-ion battery
    April 19, 2012
    Hyundai Heavy Industries (HHI), and Magna E-Car Systems (Magna E-Car), a supplier of components and systems for hybrid and electric vehicles, have announced a joint venture named Mahy E-Cell as a platform to co-develop and grow a successful battery cell and battery pack business. Under the agreement, HHI and Magna E-Car will jointly conduct engineering, design, development and testing activities with the goal of preliminary validation of battery cell and battery pack technologies for electric and hybrid ele
  • Driving forward cooperative intersection safety applications
    July 24, 2012
    Gregory Davis, FHWA, John Harding, NHTSA, and Mike Schagrin, ITS Joint Program Office (RITA) chart the course for cooperative intersection safety applications being pursued as part of the IntelliDrive programme. Crashes at intersections accounted for 8,703 highway fatalities in the US in 2008. Research and development is moving forward on IntelliDriveSM safety applications designed to help drivers avoid intersection accidents. These new safety systems could substantially drive down the highway death and inj