Skip to main content

Toshiba develops electric-powered bus with short charging time

Small buses owned by Tokyo's Minato Ward, in Japan, will be retrofitted by with new motors and lithium-ion cells developed by electronics major Toshiba. In fiscal 2013, the Ward aims to start full operations of the electric-powered buses and conduct pilot runs by end-fiscal 2012. The Ward intends to deploy the buses for short journeys in housing locations, as the buses need to be recharged after a trip about 12km in a bid to maintain the battery level higher than 50 per cent. At this level of battery status
May 1, 2012 Read time: 1 min
Small buses owned by Tokyo's Minato Ward, in Japan, will be retrofitted by with new motors and lithium-ion cells developed by electronics major 5392 Toshiba. In fiscal 2013, the Ward aims to start full operations of the electric-powered buses and conduct pilot runs by end-fiscal 2012.

The Ward intends to deploy the buses for short journeys in housing locations, as the buses need to be recharged after a trip about 12km in a bid to maintain the battery level higher than 50 per cent. At this level of battery status, the buses only require five minutes of charging time, which is a quarter of time needed with regular lithium-ion battery.

For more information on companies in this article

Related Content

  • ABB to deliver fast charging solution to Denmark
    June 1, 2018
    Asea Brown Boveri (ABB) will deliver four electric buses and a fast charger to the city of Aarhus, Denmark, and its bus operator Busselskabet Aarhus Sporveje. The vehicles will replace four diesel buses to combat air pollution and they are expected to be operational by August 2019. ABB’s 300kW OppCharge platform will be located at the end point of the 15km long route of line 13, where the buses will be recharged. OppCharge can power single and double-deck electric buses using a pantograph to connect the
  • Jeddah transport plan to be developed by Foster + Partners
    April 8, 2015
    Following an international design competition, architecture and integrated design company Foster + Partners Team has been appointed to develop the architectural vision for Jeddah’s city-wide public transport plan. Taking a long-term, sustainable approach, which anticipates growth centuries from now, the vision for Jeddah’s transport network includes the design of metro, ferry, bus, cycle, public spaces and nodes of development. The comprehensive plan extends from the design of the stations to the trains
  • Tags or communication based toll payment systems?
    January 20, 2012
    Midland Expressway Ltd's Tom Fanning discusses deployment of Near Field Communicationbased payment on the M6 Toll facility The M6 Toll's introduction from early next year of Near Field Communication (NFC) is a pragmatic response to the relative scarcity of tolled facilities and the concomitant low levels of tag take-up in the UK, according to the road's operator, Midland Expressway Ltd (MEL). Nevertheless, Dedicated Short-Range Communication (DSRC)-based tags operating at 5.8GHz are still a key part of the
  • The weighty problem of truck routing enforcement
    March 17, 2015
    The growing impact of heavy commercial vehicles on urban and interurban highway infrastructures around the world is driving the need for reliable route access restriction and monitoring. The support role of enforcement is proving fertile ground for ITS development. Bridges are especially vulnerable – and critical in terms of travel delays. The US state of Oregon’s Department of Transportation (ODOT) operates what it claims is one of the country’s most aggressive truck route restriction enforcement programme