Skip to main content

Toll option for new Cape Fear bridge

North Carolina councillors voted to leave option open for proposed structure
By Liam McLoughlin June 6, 2025 Read time: 2 mins
Cape Fear Memorial Bridge in Wilmington, NC (© Rzyotova | Dreamstime.com)

Councillors in North Carolina have left the option open for the proposed replacement Cape Fear Memorial Bridge to be a toll bridge.

Planning and development are underway to replace the Cape Fear Memorial Bridge in Wilmington. The bridge spans the Cape Fear River between Brunswick and New Hanover counties.

Councillors at the Wilmington Urban Area Metropolitan Planning Organization (WMPO) voted to leave the toll option open for the proposed new bridge by eight votes to four, according to local news outlet WECT.

The North Carolina Department of Transportation (NCDoT) says that the bridge replacement would help improve traffic congestion and mobility on a corridor that connects local communities and carries trucks transporting freight to and from the Port of Wilmington.

The proposed new bridge would cost an estimated US$1bn-plus to build. ITS International's sister title Global Highways previously reported that funding worth US$242m was being provided to NCDoT for the Cape Fear bridge replacement project in a funding package being delivered through the Bipartisan Infrastructure Law, but this has come into doubt since the election of the Trump administration. 

The toll option would be one possible way of helping to fill any potential gap in funding.

NCDoT adds that the existing four-lane, steel vertical-lift bridge built in 1969 is becoming functionally obsolete and can no longer effectively service current traffic demands.

"While the existing bridge is safe, it is reaching the end of its lifecycle and must be monitored, inspected and maintained on a more frequent basis," NCDOT states.

For more information on companies in this article

Related Content

  • Vancouver to replace tunnel with toll bridge
    September 30, 2013
    In an effort to reduce "the worst bottleneck" to traffic in the region, Vancouver, British Columbia, is to replace the Massey Tunnel on highway 99 with a wider bridge that is expected to be a tolled. The four-lane lane tunnel, which opened in 1959, is heavily overloaded for much of the day, carrying an average daily traffic of around 80,000 vehicles. Public consultation favoured a new bridge over the alternatives of renovation and additional tubes.
  • Tennessee releases transportation program
    April 7, 2014
    Tennessee Department of Transportation (TDOT) has released its three-year transportation program, featuring approximately US$1.5 billion in infrastructure investments for 59 individual project phases in 41 counties, as well as 14 state-wide programs. Due to the uncertainty of the future of the Federal Highway Trust Fund, TDOT has taken a conservative approach to this building program. The program does not feature early engineering work on any new projects. TDOT is continuing its pay-as-you-go philosophy and
  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • New Zealand ponders tolling new major roads
    July 22, 2024
    Roads of National Significance may get alternative funding to speed their completion