Skip to main content

Toll option for new Cape Fear bridge

North Carolina councillors voted to leave option open for proposed structure
By Liam McLoughlin June 6, 2025 Read time: 2 mins
Cape Fear Memorial Bridge in Wilmington, NC (© Rzyotova | Dreamstime.com)

Councillors in North Carolina have left the option open for the proposed replacement Cape Fear Memorial Bridge to be a toll bridge.

Planning and development are underway to replace the Cape Fear Memorial Bridge in Wilmington. The bridge spans the Cape Fear River between Brunswick and New Hanover counties.

Councillors at the Wilmington Urban Area Metropolitan Planning Organization (WMPO) voted to leave the toll option open for the proposed new bridge by eight votes to four, according to local news outlet WECT.

The North Carolina Department of Transportation (NCDoT) says that the bridge replacement would help improve traffic congestion and mobility on a corridor that connects local communities and carries trucks transporting freight to and from the Port of Wilmington.

The proposed new bridge would cost an estimated US$1bn-plus to build. ITS International's sister title Global Highways previously reported that funding worth US$242m was being provided to NCDoT for the Cape Fear bridge replacement project in a funding package being delivered through the Bipartisan Infrastructure Law, but this has come into doubt since the election of the Trump administration. 

The toll option would be one possible way of helping to fill any potential gap in funding.

NCDoT adds that the existing four-lane, steel vertical-lift bridge built in 1969 is becoming functionally obsolete and can no longer effectively service current traffic demands.

"While the existing bridge is safe, it is reaching the end of its lifecycle and must be monitored, inspected and maintained on a more frequent basis," NCDOT states.

For more information on companies in this article

Related Content

  • Ferrovial consortium to build I-77 HOT lanes
    June 30, 2014
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • Thomas Concrete Group “growing in the US and Europe”
    February 17, 2017
    The Swedish Thomas Concrete Group says it continues to grow in the United States, with the acquisition of three concrete plants in North and South Carolina, complementing the group’s network along the Atlantic coast. At the end of 2016, the Group also acquired three concrete plants in northern Poland. “Through strategic acquisitions in the US states of North Carolina, South Carolina and Georgia, Thomas Concrete Group has over the years achieved a strong position as a key supplier of ready-mixed concre
  • Consortium to study UK eHighway feasibility 
    August 11, 2021
    Partners including Siemens hope overhead electricity lines will serve major roads by 2030s
  • $160m available for US ITS projects
    September 21, 2022
    Significant boost for ITS from Bipartisan Infrastructure Law signed last year