Skip to main content

Toll option for new Cape Fear bridge

North Carolina councillors voted to leave option open for proposed structure
By Liam McLoughlin June 6, 2025 Read time: 2 mins
Cape Fear Memorial Bridge in Wilmington, NC (© Rzyotova | Dreamstime.com)

Councillors in North Carolina have left the option open for the proposed replacement Cape Fear Memorial Bridge to be a toll bridge.

Planning and development are underway to replace the Cape Fear Memorial Bridge in Wilmington. The bridge spans the Cape Fear River between Brunswick and New Hanover counties.

Councillors at the Wilmington Urban Area Metropolitan Planning Organization (WMPO) voted to leave the toll option open for the proposed new bridge by eight votes to four, according to local news outlet WECT.

The North Carolina Department of Transportation (NCDoT) says that the bridge replacement would help improve traffic congestion and mobility on a corridor that connects local communities and carries trucks transporting freight to and from the Port of Wilmington.

The proposed new bridge would cost an estimated US$1bn-plus to build. ITS International's sister title Global Highways previously reported that funding worth US$242m was being provided to NCDoT for the Cape Fear bridge replacement project in a funding package being delivered through the Bipartisan Infrastructure Law, but this has come into doubt since the election of the Trump administration. 

The toll option would be one possible way of helping to fill any potential gap in funding.

NCDoT adds that the existing four-lane, steel vertical-lift bridge built in 1969 is becoming functionally obsolete and can no longer effectively service current traffic demands.

"While the existing bridge is safe, it is reaching the end of its lifecycle and must be monitored, inspected and maintained on a more frequent basis," NCDOT states.

For more information on companies in this article

Related Content

  • Kapsch preferred bidder on Ohio River Bridges toll project
    March 13, 2015
    The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
  • Twenty year vision for Birmingham city transport
    November 14, 2014
    A white paper setting out Birmingham’s 20-year vision for improving transport across the city is set to be unveiled today. Birmingham Connected aims to make the city safer and easier to travel around by reducing congestion and promoting more sustainable forms of transport. Initiatives in the plan include the completion of a US$1.9 billion public transport network within 20 years and the development of Green Travel Districts to enable people to walk, cycle or take public transport safely. A feasibilit
  • $7bn funding from FHWA for US infrastructure resilience
    August 8, 2023
    Money will be available for highway and transit projects to mitigate climate change effects
  • Smart cities: first, define your strategy
    April 27, 2020
    How smart are we really being about smart mobility? Martin Howell of Worldline UK and Ireland reckons we could do better – but to do so you have to start asking the right questions…