Skip to main content

Toll option for new Cape Fear bridge

North Carolina councillors voted to leave option open for proposed structure
By Liam McLoughlin June 6, 2025 Read time: 2 mins
Cape Fear Memorial Bridge in Wilmington, NC (© Rzyotova | Dreamstime.com)

Councillors in North Carolina have left the option open for the proposed replacement Cape Fear Memorial Bridge to be a toll bridge.

Planning and development are underway to replace the Cape Fear Memorial Bridge in Wilmington. The bridge spans the Cape Fear River between Brunswick and New Hanover counties.

Councillors at the Wilmington Urban Area Metropolitan Planning Organization (WMPO) voted to leave the toll option open for the proposed new bridge by eight votes to four, according to local news outlet WECT.

The North Carolina Department of Transportation (NCDoT) says that the bridge replacement would help improve traffic congestion and mobility on a corridor that connects local communities and carries trucks transporting freight to and from the Port of Wilmington.

The proposed new bridge would cost an estimated US$1bn-plus to build. ITS International's sister title Global Highways previously reported that funding worth US$242m was being provided to NCDoT for the Cape Fear bridge replacement project in a funding package being delivered through the Bipartisan Infrastructure Law, but this has come into doubt since the election of the Trump administration. 

The toll option would be one possible way of helping to fill any potential gap in funding.

NCDoT adds that the existing four-lane, steel vertical-lift bridge built in 1969 is becoming functionally obsolete and can no longer effectively service current traffic demands.

"While the existing bridge is safe, it is reaching the end of its lifecycle and must be monitored, inspected and maintained on a more frequent basis," NCDOT states.

For more information on companies in this article

Related Content

  • Toll upgrades for Sydney Harbour Bridge and Tunnel
    March 29, 2016
    Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to replace the existing road tolling systems for Sydney Harbour Bridge and Sydney Harbour Tunnel operated by the New South Wales Roads and Maritime Services (RMS). The contract, worth more than US$112 million (€10 million), comprises supply of a new tolling system, as well as maintenance and support for five years. The new tolling solution is expected to be operating by early 2017. Kapsch will deliver its latest tolling technology based on th
  • Georgia DoT showcases its connectivity
    March 3, 2020
    Georgia DoT’s regional connected vehicle programme could be a model for the rest of the US. Adam Hill speaks to two men involved in making it a reality – and takes a look at the state’s first-ever Tech Showcase
  • Gulf Traffic Q&A: Middle East in Focus
    October 9, 2019
    Gulf Traffic takes place on 9-11 December in Dubai – the centre of business in the Middle East and North Africa. ITS International is the official media partner of Gulf Traffic, and this year the event will highlight the latest technologies and systems from global suppliers. Rahul Rawat, exhibition director, explains how the international industry can benefit from the opportunities that the region provides.
  • Taking virtual control of the control room
    June 9, 2020
    When you can’t meet customers face to face, it creates problems for all businesses. But Adam Hill finds that the control room tech sector has been adapting