Skip to main content

Thales wins San Francisco train control contract

Thales has been awarded a US$23 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, an extension of the existing T Line. Thales will supply its field-proven SelTrac communications based train control (CBTC) technology for the 1.7 mile project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a ra
October 15, 2014 Read time: 2 mins
596 Thales has been awarded a US$23 million contract by the 4802 San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, an extension of the existing T Line.

Thales will supply its field-proven SelTrac communications based train control (CBTC) technology for the 1.7 mile project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a rapid transit link to a burgeoning technology and digital media hub and improve access to a premier commercial district and tourist attraction.

For SFMTA, the SelTrac CBTC solution provides maximum performance in terms of headways, passenger throughput and energy conservation. It monitors the location of each train with a high degree of accuracy, which allows faster response times, more tightly controlled movements and easier expandability and adaptability. In addition, the solution offers the opportunity to lower life-cycle costs and increase revenue by moving more people more quickly. For passengers, the system will result in safe operations and a more predictable commute.

For more information on companies in this article

Related Content

  • Mitsubishi consortium receives letter of conditional acceptance for Doha Metro
    February 23, 2015
    A consortium of Mitsubishi Heavy Industries, Mitsubishi Corporation; Hitachi, The Kinki Sharyo and Thales has received a Letter of Conditional Acceptance from the Qatar Railways Company (Qatar Rail) for a systems package for the Doha Metro, the first metro system to be constructed in the State of Qatar. It is said to be one of the world’s largest projects for a single metro system. Construction is scheduled for completion by October 2019. Qatar Rail is the owner and manager of Qatar’s rail network and respo
  • A fresh approach to electronic fee collection
    July 16, 2012
    The Utah Transit Authority (UTA) is pioneering fresh approaches to Electronic Fee Collection (EFC) deployment in the US. Its new system, operational since January 2009 on all buses and commuter trains, is the country's first full-network rollout of transit e-ticketing technology built on an open-payment network, according to the organisation's Technology Programme Development Manager Craig Roberts.
  • Washington launches multimodal transportation plan
    October 24, 2014
    Mayor Vincent C. Gray and District Department of Transportation (DDOT) director Matt Brown have released the final US$54 million moveDC Transportation Plan. The plan is a comprehensive, multimodal transportation strategy that outlines policies, programs and capital investments to enhance the District’s transportation network and includes detailed elements or master plans for each mode of travel in the District. The moveDC plan is the culmination of an 18-month process that has involved thousands of resid
  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag