Skip to main content

Thales wins San Francisco train control contract

Thales has been awarded a US$23 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, an extension of the existing T Line. Thales will supply its field-proven SelTrac communications based train control (CBTC) technology for the 1.7 mile project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a ra
October 15, 2014 Read time: 2 mins
596 Thales has been awarded a US$23 million contract by the 4802 San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, an extension of the existing T Line.

Thales will supply its field-proven SelTrac communications based train control (CBTC) technology for the 1.7 mile project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide a rapid transit link to a burgeoning technology and digital media hub and improve access to a premier commercial district and tourist attraction.

For SFMTA, the SelTrac CBTC solution provides maximum performance in terms of headways, passenger throughput and energy conservation. It monitors the location of each train with a high degree of accuracy, which allows faster response times, more tightly controlled movements and easier expandability and adaptability. In addition, the solution offers the opportunity to lower life-cycle costs and increase revenue by moving more people more quickly. For passengers, the system will result in safe operations and a more predictable commute.

For more information on companies in this article

Related Content

  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • Mauritius sets out to modernise public transport 
    March 19, 2020
    The National Land Transport Authority (NLTA) in Mauritius is using LIT Transit's mobility platform to provide integrated mobility management and passenger information capabilities on public transport. 
  • B&C Transit modernises Miami-Dade Metrorail’s control systems
    June 1, 2016
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.