Skip to main content

Thales wins major ETCS Level 2 project in Hungary

Thales Austria has signed the contract with the Hungarian infrastructure company NIF to provide modern electronic train control technology for the 101 km electrified Boba-Bajánsenye line. The contract includes the design, supply, installation and commissioning of a complete European Train Control System (ETCS) Level 2 solution and adaptations to the existing ETCS Level 1 system.
May 28, 2012 Read time: 1 min
RSS596 Thales Austria has signed the contract with the Hungarian infrastructure company 4238 NIF to provide modern electronic train control technology for the 101 km electrified Boba-Bajánsenye line. The contract includes the design, supply, installation and commissioning of a complete European Train Control System (ETCS) Level 2 solution and adaptations to the existing ETCS Level 1 system.

The project is worth US$22.64 million euros and is 85 per cent funded by the European Union. It is the first complete ETCS Level 2 project for the Hungarian State Railway 5760 MÁV.

For more information on companies in this article

Related Content

  • Kapsch TrafficCom wins $355 million nationwide ETC system in Belarus
    June 19, 2012
    Kapsch TrafficCom has won an order, valued at just over US$355.5 million, for the implementation and operation of a nationwide electronic toll collection system in the Republic of Belarus. The agreement signed by Erwin Toplak, COO of Kapsch TrafficCom, and Ivan I. Shcherbo, Minister for Transportation and Communication of the Republic of Belarus, extends over a total road network of 2,743km and is for both the implementation of a dedicated short-range communication-based system as well as its operation over
  • Tolls to help fund improvements to the Brent Spence Bridge
    January 29, 2015
    The International Bridge, Tunnel and Turnpike Association (IBTTA) has applauded Governors Beshear (Kentucky) and Kasich (Ohio) following their announcement that they plan to use tolls to pay for at least part of the US$2.63 billion Brent Spence Bridge replacement. Brent Spence Bridge is a double deck, cantilevered truss bridge that carries Interstates 71 and 75 across the Ohio River between Covington, Kentucky and Cincinnati, Ohio. Originally designed to carry 80,000 vehicles per day, approximately 172,0
  • Connecticut mulls toll roads
    May 17, 2012
    In a bid to narrow the state's budget gap, lawmakers in Connecticut are considering the reintroduction of toll roads. The state is facing a budget shortfall of US$3.5 billion – around 18 per cent of its total spending, and the proposal would see the introduction of electronic tolls around the state's entry points. According to a Cambridge Systematics study, annual toll revenue could reach $600 million with a fee of $5 to cross tolling points. It is thought that the move may be accompanied by a gas tax reduc
  • U-blox GSM module verified eCall and ERA Glonass ready
    April 18, 2012
    U-blox and Rohde & Schwarz, a leading supplier of test and measurement equipment, have successfully concluded tests of u-blox’ Leon GSM modem for eCall / ERA Glonass readiness.