Skip to main content

Thales wins major ETCS Level 2 project in Hungary

Thales Austria has signed the contract with the Hungarian infrastructure company NIF to provide modern electronic train control technology for the 101 km electrified Boba-Bajánsenye line. The contract includes the design, supply, installation and commissioning of a complete European Train Control System (ETCS) Level 2 solution and adaptations to the existing ETCS Level 1 system.
May 28, 2012 Read time: 1 min
RSS596 Thales Austria has signed the contract with the Hungarian infrastructure company 4238 NIF to provide modern electronic train control technology for the 101 km electrified Boba-Bajánsenye line. The contract includes the design, supply, installation and commissioning of a complete European Train Control System (ETCS) Level 2 solution and adaptations to the existing ETCS Level 1 system.

The project is worth US$22.64 million euros and is 85 per cent funded by the European Union. It is the first complete ETCS Level 2 project for the Hungarian State Railway 5760 MÁV.

For more information on companies in this article

Related Content

  • New York’s Midtown in Motion traffic management system wins ITS America award
    June 6, 2012
    ITS America has recognised the New York City Department of Transportation (NYC DoT) for Midtown in Motion, the sophisticated traffic management system launched last July that uses ITS to ease traffic congestion, improve traffic flow, and reduce greenhouse emissions and air pollution on the city’s most congested streets. Coinciding with the award, NYC DoT announced that it is expanding the system, which currently covers 110-square blocks, to cover 270-square blocks in the city’s most heavily congested neighb
  • Is the US economic stimulus programme working?
    January 30, 2012
    In this third installment in a series of articles exploring the impact of the US economic stimulus programme on the ITS industry, Pete Goldin reports on the ongoing debate in Congress about American Recovery and Reinvestment Act. A debate continues to rage in the US Congress and in the media about the effectiveness of the American Recovery and Reinvestment Act of 2009 (ARRA), and especially the timeliness of the ARRA payments. Some of the arguments seem somewhat partisan in origin while others point out fla
  • Puerto Rico deals
    April 19, 2012
    The authorities in Puerto Rico awarded a contract to a consortium for two toll roads under a 40 year deal. The joint venture partnership comprises Spanish firm Abertis and Goldman Sachs' GS Global Infrastructure Partners II. The deal concerns the 83km PR22 road and the 8km PR5 road. The PR22 link is a major route with up to 10 lanes at its widest point while the urban PR5 road runs from PR22 to the western suburbs of San Juan.
  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser