Skip to main content

Thales upgrading Kuala Lumpur monorail signalling

Scomi Engineering, which is upgrading Kuala Lumpur monorail for its operator Prasarana, has selected Thales to supply a turnkey signalling solution costing some US$18.6 million. The monorail, operational since 2003 in Malaysia’s capital, is currently expanding its passenger transportation capacity by the introduction of new rolling stock with four-carriage trains and by the replacement of the existing signalling along the eleven stations of the monorail.
March 23, 2012 Read time: 1 min
928 Scomi Engineering, which is upgrading Kuala Lumpur monorail for its operator Prasarana, has selected 596 Thales to supply a turnkey signalling solution costing some US$18.6 million. The monorail, operational since 2003 in Malaysia’s capital, is currently expanding its passenger transportation capacity by the introduction of new rolling stock with four-carriage trains and by the replacement of the existing signalling along the eleven stations of the monorail.

The scope of Thales' contract includes a new signaling system for the main line section and a depot, based on an ETCS Level 1 solution, interlocking systems and a new operational control centre. Thales, will also install on-board ETCS level 1 computers on 12 new vehicles. The company says this project represents a particular challenge since the system has to be implemented in a short timeframe and without impacting the daily operation of this vital infrastructure.

Execution of the contract will be concluded by August 2012, and the new structure is expected to be inaugurated in November 2012.

For more information on companies in this article

Related Content

  • Queensland extends emergency vehcile priority system
    December 18, 2014
    Following encouraging results from an initial small-scale trial of an emergency vehicle priority system in Queensland, Australia, the scheme is now being extended. In an emergency every second counts. Nowhere is this more graphically illustrated than by the survivability statistics for the time to cardiopulmonary resuscitation of pre-hospital cardiac arrest: at four minutes the survival rate is 22% but by 14 minutes the survival has dropped to 5% - as can be seen from the graph below. There is a similar tre
  • LA confirms $133m transit contracts
    April 5, 2021
    Sepulveda Transit Corridor Project includes rail and monorail solutions for busy road routes
  • Transport technology transforming bus stops in Los Angeles
    January 20, 2012
    David Crawford reports on a pioneering blend of transport technology and aesthetic By gaining a design award before installation has even started, the US$6.9 million City of Santa Monica (California)'s Big Blue Bus Shelter and Branding Package has ensured early interest among what it expects to be a new wave of transit riders. The American Institute of Architects' Los Angeles chapter's recently conferred 'Next LA Citation Award for Architecture', given for design excellence in projects as yet unbuilt, comm
  • Vancouver's metro transport promotes alternatives to driving
    January 26, 2012
    David Crawford looks at Vancouver and the legacy of a Olympic transport success