Skip to main content

Thales to upgrade Norwegian railway

Thales has announced that it has been awarded a framework contract by the Norwegian rail administrator, Jernbaneverket (JBV), to supply a new railway signal interlocking system. The first three projects in the contract, worth over US$41,400,000, are for new signalling systems for the Sandnes-Stavanger line, the Ganddal cargo terminal and Høvik station.
September 6, 2012 Read time: 1 min
596 Thales has announced that it has been awarded a framework contract by the Norwegian rail administrator, 6523 Jernbaneverket (JBV), to supply a new railway signal interlocking system. The first three projects in the contract, worth over US$41,400,000, are for new signalling systems for the Sandnes-Stavanger line, the Ganddal cargo terminal and Høvik station.

This contract will secure JBV’s need for conventional signalling systems until the next generation of digital signalling solutions and automatic traffic control, as required by the European Rail Traffic Management System (ERTMS) is in place. Thales has already successfully installed the interlocking system on a number of critical lines in Finland and is currently implementing the new ERTMS standard for digital signalling in Denmark.

For more information on companies in this article

Related Content

  • Closer running and investment to boost capacity of Britain’s railways, says new report
    January 4, 2017
    Closer running to increase the frequency of train services, alongside investment in new railway infrastructure, are recommendations to boost UK rail capacity in the new report by the Institution of Mechanical Engineers and the Transportation Research Laboratory (TRL). The report, Increasing capacity; putting Britain’s railways back on track, makes recommendations to meet growing rail passenger demand, which is forecast to double by the 2040s. The Institution of Mechanical Engineers and TRL are offering s
  • Jenoptik announces toll monitoring first at ITS World Congress
    October 12, 2016
    Jenoptik has entered a new era during this week’s ITS World Congress with the announcement of its first highway toll-monitoring contract. By mid-2018 it will supply global logistics services provider Toll Collect with up to 600 toll payment-monitoring pillars to monitor truck toll payments as part of the planned extension of compulsory tolls for trucks using Germany’s federal highways.
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • LA metro line to be extended
    November 10, 2014
    The Skanska joint venture with Traylor Brothers, Inc. and J.F. Shea Construction has been awarded a design-build contract by the Los Angeles County Metropolitan Transportation Authority to extend the Los Angeles Metro Purple Line.