Skip to main content

Thales to upgrade New York’s Queens Boulevard subway line

In a contract worth US$49.6 million from the New York Metropolitan Transportation Authority (MTA), Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution. The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.
October 1, 2015 Read time: 2 mins
In a contract worth US$49.6 million from the New York 1267 Metropolitan Transportation Authority (MTA), 596 Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution.

The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.

The contract is one of two that will allow New York City Transit to operate more trains per hour on this line, thereby increasing passenger capacity, and provide improved and more reliable services.  When complete, this multi-year contract will enable the line to use a CBTC system on multiple routes. The other contract was awarded to 189 Siemens.

MTA sees the line as being the first interoperable line in the world, which will allow Thales’ equipment to work seamlessly with other CBTC suppliers’ equipment.

SelTrac CBTC continuously updates train positions, distances and travel speeds, allowing for faster and more efficient operations. Continuous updates allow the subway system to recover quickly from delays and restore consistent wait times at subway stations for passengers.

The installation of SelTrac CBTC will maintain the signalling system in a state of good repair and will also enhance safety for passengers and employees alike. With CBTC, NYC Transit can program a work zone so trains cannot exceed a set speed, making the work zone much safer for workers on the tracks.

For more information on companies in this article

Related Content

  • Integrate systems to reduce roadside infrastructure
    January 27, 2012
    David Crawford reviews promising current developments. Instrumentation of the road infrastructure has grown to become one of the most dynamic sectors of the ITS industry. Drivers for its deployment include global concerns over the commercial and environmental pressures of traffic congestion, the importance of keeping drivers informed throughout their journeys, and the need to reduce accident rates and promote the safety of all road users, for example by enforcing traffic safety rules.
  • US DOT makes funding available for positive train control implementation
    July 29, 2016
    The US Department of Transportation has made US$199 million in competitive grant funding for positive train control (PTC) implementation. The grants, which will be selected by the Federal Railroad Administration (FRA) and awarded and administered by the Federal Transit Administration (FTA), will help commuter railroads implement PTC, which prevents accidents and saves lives. FRA will accept applications until 5 pm EDT on 28 Sept. 28ember. Projects eligible for grants must develop information that ass
  • Metro-North seat tracker links to Google Maps 
    December 27, 2021
    Real-time data shows estimated customers in each car on New York MTA rail route
  • Winsted: ‘Minimise distraction – maximise focus’
    June 13, 2022
    Traffic management is a physically and mentally demanding job – so select transportation control room furniture that provides bumper-to-bumper productivity, says Randy Smith of Winsted