Skip to main content

Thales to upgrade New York’s Queens Boulevard subway line

In a contract worth US$49.6 million from the New York Metropolitan Transportation Authority (MTA), Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution. The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.
October 1, 2015 Read time: 2 mins
In a contract worth US$49.6 million from the New York 1267 Metropolitan Transportation Authority (MTA), 596 Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution.

The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.

The contract is one of two that will allow New York City Transit to operate more trains per hour on this line, thereby increasing passenger capacity, and provide improved and more reliable services.  When complete, this multi-year contract will enable the line to use a CBTC system on multiple routes. The other contract was awarded to 189 Siemens.

MTA sees the line as being the first interoperable line in the world, which will allow Thales’ equipment to work seamlessly with other CBTC suppliers’ equipment.

SelTrac CBTC continuously updates train positions, distances and travel speeds, allowing for faster and more efficient operations. Continuous updates allow the subway system to recover quickly from delays and restore consistent wait times at subway stations for passengers.

The installation of SelTrac CBTC will maintain the signalling system in a state of good repair and will also enhance safety for passengers and employees alike. With CBTC, NYC Transit can program a work zone so trains cannot exceed a set speed, making the work zone much safer for workers on the tracks.

For more information on companies in this article

Related Content

  • 3M reflect on why CAVs need lines and signs
    May 10, 2017
    Tammy Meehan and Thomas Hedblom of 3M consider the ongoing development of technology needed to introduce connected and autonomous vehicles. The transportation industry is in the midst of the most dramatic shift since Henry Ford introduced horseless carriages. Already we are seeing the increased use of advanced driver assistance systems (ADAS) which, along with the introduction of autonomous vehicles in the next few decades, will bring profound changes to vehicles and the environment in which they operate.
  • Thales awarded two ticketing deals in Egypt
    June 16, 2017
    Thales has signed two new fare collection contracts covering 19 new stations on the Cairo metro.
  • Siemens to implement motorway junction improvements
    February 13, 2015
    Siemens is to supply and install traffic signals and controllers for two major junction improvements schemes on the M27 motorway in Hampshire, UK. The contracts, which are funded by the UK government’s US$488 million pinch point scheme, have been awarded by civil contractors Interserve Construction and Jackson Civil Engineering and are intended to help alleviate the flow of traffic joining and leaving the busy M27 junctions 3 and 5. The upgrade work, which is already underway, will see additional lane
  • ‘Formation flying’ engineering trains used to upgrade railway
    February 16, 2017
    In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on