Skip to main content

Thales to upgrade New York’s Queens Boulevard subway line

In a contract worth US$49.6 million from the New York Metropolitan Transportation Authority (MTA), Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution. The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.
October 1, 2015 Read time: 2 mins
In a contract worth US$49.6 million from the New York 1267 Metropolitan Transportation Authority (MTA), 596 Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution.

The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.

The contract is one of two that will allow New York City Transit to operate more trains per hour on this line, thereby increasing passenger capacity, and provide improved and more reliable services.  When complete, this multi-year contract will enable the line to use a CBTC system on multiple routes. The other contract was awarded to 189 Siemens.

MTA sees the line as being the first interoperable line in the world, which will allow Thales’ equipment to work seamlessly with other CBTC suppliers’ equipment.

SelTrac CBTC continuously updates train positions, distances and travel speeds, allowing for faster and more efficient operations. Continuous updates allow the subway system to recover quickly from delays and restore consistent wait times at subway stations for passengers.

The installation of SelTrac CBTC will maintain the signalling system in a state of good repair and will also enhance safety for passengers and employees alike. With CBTC, NYC Transit can program a work zone so trains cannot exceed a set speed, making the work zone much safer for workers on the tracks.

For more information on companies in this article

Related Content

  • New York MTA extends Cubic MetroCard contract
    November 18, 2016
    Cubic Transportation Systems (CTS) has been awarded a US$40.3 million contract extension from the Metropolitan Transportation Authority (MTA) New York City Transit (NYCT) for software programming and maintenance support for the agency’s MetroCard automated fare collection (AFC) system. The extension is on an as-needed basis until the system is decommissioned, which is expected to occur in 2022, when it will be replaced by MTA’s new fare payment system, featuring mobile ticketing and open payments via co
  • San Diego rail line gets positive train control
    July 24, 2013
    Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
  • Thales to implement traffic control system on Spanish rail line
    October 7, 2015
    Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved
  • Wireless technology aids workzone communications
    June 7, 2012
    Need for a temporary communication fix during a construction project has led to rapid deployment of a permanent but simplistic wireless broadband network in Chandler, Arizona When a major construction project was expected to disrupt highway communications in the city of Chandler, Arizona, the city’s engineers went looking for a simple solution. They needed a way of maintaining data connections with three consecutive intersections along Arizona Avenue in Chandler while construction necessitated the severin