Skip to main content

Thales to upgrade Greater Cairo Metro

More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
December 18, 2015 Read time: 2 mins

More than 30 years after winning its first contract for the Greater Cairo Metro, 596 Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3).

Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment installed in the 1980s, when these first two lines were built. Under the contract, Thales will supply 850 access gates, 100 vending terminals for ticket outlets and 75 portable ticket control terminals, as well as implementing new system architecture. In addition, the TransCity central system will supervise all data generated across the existing network and accommodate future network evolutions and extensions. 

The 18-month project will be conducted on one of the densest public transport networks in the world with no disruption to passenger flows. Once completed, a combination of magnetic stripe and contactless fare media technology will make it easier for passengers to access the metro system. The new fare collection equipment installed at stations on Lines 1 and 2 will improve reliability while reducing maintenance costs.

Under the second contract, in a consortium with Alstom, Thales has signed a contract to implement an integrated communications and supervision system for 15 new stations and an additional depot on more than 17km Attaba to Rod El Farag and Cairo University. This extension is one of the Egyptian authorities’ strategic investments in Cairo to increase the level of public transport services and will result in 76 months of activity.

For more information on companies in this article

Related Content

  • Telent extends TfL signal deal
    September 28, 2020
    Maintenance assets include traffic signals, VMS and over-height vehicle detection systems
  • Study shows Irish speed cameras provide five-fold benefit
    April 30, 2015
    Ireland’s mobile speed cameras have been shown to save lives and money but face a legal challenge. David Crawford reports. In 2011 the Republic of Ireland introduced mobile safety cameras on dangerous roads which have, according to the country’s first cost-benefit analysis of the technology, saved an average of 23 lives a year.
  • Nantes and Lyon to upgrade ticketing
    May 23, 2014
    Xerox is to begin upgrading the bank card payment modules in devices on the public transport networks of Nantes in north-west France and Lyon in south-east France, to ensure they conform to the latest banking standards. Ticket vending machines in both Nantes and Lyon and ticket booking office terminals in Lyon, installed between 2000 and 2005, will be upgraded.
  • Keeping people on track is RATP’s raison d’etre
    June 14, 2018
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule