Skip to main content

Thales to upgrade Greater Cairo Metro

More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
December 18, 2015 Read time: 2 mins

More than 30 years after winning its first contract for the Greater Cairo Metro, 596 Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3).

Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment installed in the 1980s, when these first two lines were built. Under the contract, Thales will supply 850 access gates, 100 vending terminals for ticket outlets and 75 portable ticket control terminals, as well as implementing new system architecture. In addition, the TransCity central system will supervise all data generated across the existing network and accommodate future network evolutions and extensions. 

The 18-month project will be conducted on one of the densest public transport networks in the world with no disruption to passenger flows. Once completed, a combination of magnetic stripe and contactless fare media technology will make it easier for passengers to access the metro system. The new fare collection equipment installed at stations on Lines 1 and 2 will improve reliability while reducing maintenance costs.

Under the second contract, in a consortium with Alstom, Thales has signed a contract to implement an integrated communications and supervision system for 15 new stations and an additional depot on more than 17km Attaba to Rod El Farag and Cairo University. This extension is one of the Egyptian authorities’ strategic investments in Cairo to increase the level of public transport services and will result in 76 months of activity.

Related Content

  • June 22, 2012
    Hong Kong ticketing
    Hong Kong MTR has awarded Thales a contract to supply an Automatic Fare Collection (AFC) and security access management system for West Island Line (WIL), South Island Line (SIL(E)) and Kwun Tong Line Extension (KTE), which are all new extensions, currently under construction, of the existing MTR rail network. The WIL, consisting of three stations, will add another 3km to the Island Line; SIL(E), with five stations, is a new 7km section; while KTE is a 2.6 km extension of the current Kwun Tong Line with two
  • November 23, 2023
    Thales wins Taipei metro ticketing deal
    Firm will work with MiTac Information Technology Corporation in Taiwan’s capital region
  • June 14, 2017
    First section of Delhi Metro Phase III AFT ticketing operational
    Following the deployment of the automatic fare collection (AFC) systems on Phase I and II of the Delhi Metro, Thales has now delivered the AFC systems on the first section of the 79 stations of Phase III that became operational recently. Thales has installed its new-generation Dream Gates ticket gates on two stations of the metro, allowing passengers to travel using QR code on their mobile phones, said to be a first in India. With the Dream Gates solution, Delhi Metro Rail Corporation (DMRC) has become the
  • March 22, 2016
    Thales to upgrade Taipei’s metro ticketing
    As part of Taiwan’s Ministry of Transport and Communications’ initiative to respond to the need for wider interoperability, the Taipei Rapid Transit Corporation, which operates the concession for the metro network in Taipei, has opted for Thales’s fare collection solution, to be rolled out progressively throughout 2016. The upgrade covers the entire metro network, including more than 1,500 fare gates across 120 stations, with a daily flow of over 1.97 million passengers. The Thales solution includes the