Skip to main content

Thales to upgrade Greater Cairo Metro

More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
December 18, 2015 Read time: 2 mins

More than 30 years after winning its first contract for the Greater Cairo Metro, 596 Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3).

Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment installed in the 1980s, when these first two lines were built. Under the contract, Thales will supply 850 access gates, 100 vending terminals for ticket outlets and 75 portable ticket control terminals, as well as implementing new system architecture. In addition, the TransCity central system will supervise all data generated across the existing network and accommodate future network evolutions and extensions. 

The 18-month project will be conducted on one of the densest public transport networks in the world with no disruption to passenger flows. Once completed, a combination of magnetic stripe and contactless fare media technology will make it easier for passengers to access the metro system. The new fare collection equipment installed at stations on Lines 1 and 2 will improve reliability while reducing maintenance costs.

Under the second contract, in a consortium with Alstom, Thales has signed a contract to implement an integrated communications and supervision system for 15 new stations and an additional depot on more than 17km Attaba to Rod El Farag and Cairo University. This extension is one of the Egyptian authorities’ strategic investments in Cairo to increase the level of public transport services and will result in 76 months of activity.

Related Content

  • October 27, 2017
    Cubic wins contract from MTA to replace MetroCard with new fare payment system
    Cubic Transportation Systems (CTS) has been chosen for a contract valued, $539.5 million (£409.4 million) with additional options worth $33.9 million (£25.7 million), by the New York Metropolitan Transportation Authority (MTA) to replace the MetroCard with a fare payment system similar to Transport for London (TfL). The new system is designed with the intention of providing an enhanced and integrated travel experience across the region including seamless access to Long Island Rail Road (LIRR) and Metro-Nort
  • October 25, 2022
    UITP highlights mass transit changes
    Increasingly, public transport passengers will no longer need to carry a dedicated smartcard ticket to travel, as technology enables virtually any type of contactless payment system to take over the role.
  • December 17, 2014
    Abu Dhabi seeks safe and efficient multi-modal ITS solutions
    Abu Dhabi’s Department of Transport is planning to roll out its second phase ITS Strategy and Action Plan through to 2019 which will deploy a host of innovative multimodal ITS solutions. The United Arab Emirates (UAE) is continuing to experience rapid growth in both its economy and population and none more so than its capital, Abu Dhabi. To cope with the current expansion, and in anticipation of future growth, the Abu Dhabi Surface Transport Master Plan has been devised by its Department of Transport and th
  • January 30, 2018
    TST awarded signalling contract for shanghai automated metro line
    Shanghai Shentong Metro Group has awarded Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.