Skip to main content

Thales to upgrade Greater Cairo Metro

More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
December 18, 2015 Read time: 2 mins

More than 30 years after winning its first contract for the Greater Cairo Metro, 596 Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3).

Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment installed in the 1980s, when these first two lines were built. Under the contract, Thales will supply 850 access gates, 100 vending terminals for ticket outlets and 75 portable ticket control terminals, as well as implementing new system architecture. In addition, the TransCity central system will supervise all data generated across the existing network and accommodate future network evolutions and extensions. 

The 18-month project will be conducted on one of the densest public transport networks in the world with no disruption to passenger flows. Once completed, a combination of magnetic stripe and contactless fare media technology will make it easier for passengers to access the metro system. The new fare collection equipment installed at stations on Lines 1 and 2 will improve reliability while reducing maintenance costs.

Under the second contract, in a consortium with Alstom, Thales has signed a contract to implement an integrated communications and supervision system for 15 new stations and an additional depot on more than 17km Attaba to Rod El Farag and Cairo University. This extension is one of the Egyptian authorities’ strategic investments in Cairo to increase the level of public transport services and will result in 76 months of activity.

For more information on companies in this article

Related Content

  • Consortium wins Mexico rail project
    November 27, 2014
    A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
  • Traffic signals turn red to stop speeding drivers
    March 15, 2012
    David Crawford is encouraged by the spread of 'soft' speed policing 
  • Is it time for a harmonised international standard for Weigh in Motion?
    May 15, 2024
    Weigh in Motion vendors are frustrated that OIML accreditation is not proving to be enough to satisfy tenders in some countries. In this article, the board of the International Society for Weigh in Motion suggests a possible way forward…
  • Keeping a close watch on ‘too-dangerous-to-drive’ highway
    June 21, 2016
    Like many others, the authorities in Argentina implemented ITS to improve road safety – but this case was a little different to most as Mauro Nogarin explains. The 70km of highway that separate Argentina’s capital Buenos Aires from the city of La Plata had long been considered too dangerous for anyone to make the trip with a private car. Figures on criminal attacks and vandalism with stones, nails, logs, spark plugs or any other element that can damage a car’s tyres and cause them to stop in order rob th