Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

For more information on companies in this article

Related Content

  • Interoperability facilitates mobility on Santiago’s toll roads
    August 10, 2016
    Drivers crossing Chile’s capital are benefitting from additional investment in ITS. Mauro Nogarin reports. Santiago de Chile is pioneering the development of concession-interoperable, multi-lane, free-flow urban highways. This road network crosses the city from north to south (Autopista Central), from east to west (Costanera Norte) and also includes the north-western (Vespucio Norte) and southern (Vespucio Sur) ring roads surrounding this metropolitan area of seven million people.
  • London steps up enforcement of ‘bike boxes’
    August 15, 2013
    Transport for London (TfL), the Metropolitan Police Service (MPS) and City of London Police (CoLP) has stepped up its enforcement of advanced stop lines, more commonly known as ‘bike boxes’, to help further improve safety for cyclists on the capital’s roads. Advanced stop lines are the boxes marked on the road with a bike symbol painted inside, located at many traffic lights. The cyclist has a stop line several feet ahead of the line used by other vehicles in order to give cycles more space so they can be s
  • Reducing incident clear up times, saving money
    January 24, 2012
    In 2007 in Atlanta, Georgia, it took over four hours to open the road after a major commercial vehicle incident. Not any more. Four years ago the Texas Transportation Institute (TTI) cited Atlanta, Georgia as the third-most congested city in the United States. Each traveller in metro Atlanta lost an incredible 57 hours a year to traffic delays, wasting 40 gallons of fuel while sitting in traffic. In 2007, it took nearly four and a half hours to open travel lanes after an average tractor-trailer incident. Th
  • TfL opts for RedSpeed safety cameras
    September 22, 2014
    RedSpeed International is to supply around 600 speed and red light safety cameras to Transport for London (TfL). The award is the result of a process which started in August 2012 and will see the company’s SpeedCurb and RedSpeed products progressively installed with a completion date of October 2016. The installation of the RedSpeed digital red light camera replacement in London has already started. The cameras not only enforce against red light running, but also monitor and enforce against vehicles brea