Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

For more information on companies in this article

Related Content

  • Cost saving multi-agency transportation and emergency management
    May 3, 2012
    Although the recession had dramatically reduced traffic volumes in the past few years, the economy was on the brink of a recovery that portended well for jobs but poorly for traffic congestion. Leaders of four government agencies in Houston, Texas, got together to discuss how to collectively cope with the expected increase in vehicles on the road. "They knew they couldn't pour enough concrete to solve the problem, and they also knew the old model of working in a vacuum as standalone entities would fail," sa
  • Successful trials ‘prove effectiveness’ of speed limiting technology on buses
    March 18, 2016
    Transport for London (TfL) has completed trials of intelligent speed assistance (ISA) technology fitted to buses. The trials saw the technology, which prevents vehicles from accelerating over speed limits, fully tested on two bus routes that included a variety of road environments and differing speed limits. All buses fitted with ISA remained within the speed limit 97-99 per cent of the time, which TfL says proves the effectiveness of ISA. The extremely rare incidents of excess speeds were seen on downhi
  • Greater Manchester signs significant new service contract with Siemens
    April 19, 2012
    Greater Manchester Combined Authority with Transport for Greater Manchester have awarded to Siemens one of the most significant service contracts of its kind for the long-term maintenance of traffic signalling equipment across all ten districts of Greater Manchester. Under Transport for Greater Manchester’s guidance, the service contract is designed to secure substantial energy savings and reduce carbon emissions.
  • Thales transport systems for Santo Domingo metro
    April 2, 2013
    Thales, as a member of the Eurodom consortium, has supplied communication, supervision, signalling and ticketing systems for line 2 of the Santo Domingo Metro in the Dominican Republic. The opening of the metro line, which crosses the city from east to west, is a key milestone in a national plan to improve public transport and relieve congestion on the road network. It connects to the north-south line 1 and once complete, will run for 21 km and will have twenty stations. Fourteen stations are now open and t