Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

For more information on companies in this article

Related Content

  • Siemens constructing driverless subway in Riyadh
    October 11, 2013
    A consortium of Siemens, US company Bechtel and local construction companies Almabani and Consolidated Contractors Company has been awarded a subway contract worth US$10 billion by the Riyadh High Commission for Urban Development (ArRiyadh Development Authority). Siemens, whose share of the deal is worth around US$2.1 billion, is supplying subway rolling stock, electrification systems and signalling technology for driverless operation, as well as system integration.
  • Success of London’s contactless payments
    September 19, 2014
    More than 128,000 taps using contactless payment cards and devices have been made since Transport for London (TfL) launched the new option to pay across the London transport network on 16 September. The first day saw contactless used at more than 600 train stations across the Tube, DLR, Overground and National Rail stations that accept Oyster. Contactless payments have been available on the bus network since December 2012. This week has seen a further significant rise in the number of taps on buses w
  • Thales passenger information solution for Delhi Metro extensions
    April 26, 2013
    Thales is to design, integrate and install an advanced passenger information system for the extensions to Delhi Metro Line 6, part of the Delhi Metro Phase 3 expansion programme. This new project, for the Delhi Metro Rail Corporation (DMRC) will cover nine elevated and seven underground stations, distributed over three sections of line with a total length of 23 km. It is scheduled to be commissioned in February 2015. The Thales passenger information system uses a single software platform to enable the Delhi
  • Signal optimisation reduces congestion, improves travel times
    February 2, 2012
    The Metropolitan Government of Nashville and Davidson County's Department of Public Works(MPW) identified seven corridors in the County that experience heavy traffic congestion and needed traffic signal timing improvements to improve traffic flow as well as air quality and fuel consumption. The seven corridors included a total of 223 signalised intersections. To conduct this study, termed the Traffic Signal Optimisation Study for the Metro Nashville Signal System, MPW received funding from the Federal Conge