Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

For more information on companies in this article

Related Content

  • Benefits of investment in ITS technologies
    October 19, 2012
    What price can be put on the value of a life? How much should be spent on preventing untimely deaths? Difficult questions such as these help to put the comparatively small costs of ITS systems into context. While monetary analysis may seem cold and inhumane in consideration of road casualties, death and costly clear-up are often the stark reality transportation authorities are dealing with. This issue of ITS International contains numerous examples of large benefits to be gained from relatively modest inves
  • Authorities look to MaaS for new solutions and cost savings
    July 18, 2017
    The structure of society and the way in which our cities work will be completely transformed by Mobility as a Service (MaaS), Finland’s minister of transport and communications Anne Berner, told ITS International’s recent MaaS Market conference 2017 in London. In her keynote address, Berner told a packed audience of more than 200 ITS professionals that MaaS has the potential to help governments around the world meet their big city targets such as the rate of employment, the environment, the efficient use of
  • Thales to implement traffic control system on Spanish rail line
    October 7, 2015
    Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved
  • TfL outlines new 20mph speed limit sites in central London
    March 13, 2015
    The Mayor of London and Transport for London (TfL) have outlined plans for eight new pilots of 20mph speed limits on the TfL road network (TLRN) as part of continuing work to reduce road casualties, increase active travel and enhance the areas where people live, work and shop. The first confirmed pilot location is in Tower Hamlets, which is planned to be introduced in April when all borough roads in Tower Hamlets are made 20mph. Once implemented, the route could then be extended out to cover the wider Shore