Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

For more information on companies in this article

Related Content

  • Airbiquity adds Inrix and Parkopedia to its connected car content
    August 22, 2014
    US-based connected car services supplier, Airbiquity is to integrate two industry-leading geo-aware content providers into its Choreo connected car services delivery platform, making Inrix’s traffic information and driver services and the parking information services of Parkopedia available to Airbiquity’s automotive OEM customers deploying the its Driver Experience infotainment service. Leveraging the Airbiquity content portfolio, automotive OEMs can now easily configure both INRIX traffic and Parkopedia p
  • London may trial Dutch-style roundabouts
    April 30, 2013
    Roundabouts similar to those used in the Netherlands, which separate cyclists from cars and give them priority, could be used in London as early as next year, according to Andrew Gilligan, the city's cycling commissioner. The layout means cyclists are in the clear line of sight of drivers when vehicles exit the roundabout. The trial forms part of the mayor of London's Vision for Cycling. Over 600 people have been involved so far and the effects on safety and capacity will be studied as well as the impact o
  • Salvador metro engineering contract awarded to Egis
    January 9, 2014
    French engineering and construction firm Egis has been awarded a US$16 million engineering contract by Brazil’s build and operate concessionaire CCR (Companhia de Concessões Rodoviárias) for the construction of the Salvador metro in the state capital of Bahia, Brazil. The project comprises the completion of the seven kilometre line 1, which is partly underground, the construction of five kilometres of extensions to this first line and the construction of the 24 kilometre line 2, serving Salvador’s inter
  • ITS in the Nordic states
    April 7, 2021
    Denmark, Norway, Finland and Sweden are quietly embracing advanced traffic technologies.