Skip to main content

Thales to upgrade four London Underground lines

French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
August 4, 2015 Read time: 3 mins
French transportation group 596 Thales has been awarded a £750 million (US$1,160 million) contract by 1466 Transport for London (TfL) to upgrade four London Underground (LU) lines.

Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to three million passengers daily.

Thales claims the improvements will boost capacity by an average of a third on the four lines and is vital in order to support London’s growing population. Work is expected to begin later this year and the main benefits will be delivered by 2022, when the frequency of trains running during peak periods will increase to 32 trains per hour in central London – a train every two minutes - with frequency increases at other times as well.

Nick Brown, managing director of London Underground, said: “Having successfully modernised three of the most heavily used lines on our network, we are ready to begin work to bring the next four lines into the modern era. This will transform the journeys of millions of our customers, significantly increasing service reliability and frequency.”

Bombardier was originally awarded the contract in 2011, but it and LU ‘mutually agreed’ in December 2013 to re-let the contract.

The cost per kilometre of re-signalling the four lines is comparable with the successful modernisation of the Northern line which was around half the cost of the Jubilee and Victoria line modernisations delivered under the flawed Public Private Partnership arrangements, ended by the Mayor five years ago.

The overall budget for the four line modernisation programme has been confirmed as US$8.4 trillion, which represents a reduction of US$204 million compared to an earlier estimate announced in March. This budget includes investment in 191 new modern air-conditioned walk through trains, built in the UK, and already introduced on the Metropolitan, Circle and Hammersmith & City and District lines.

The improvements will all be delivered within the existing TfL Business Plan and the programme is expected to have a benefit-cost ratio of around 4.7 to 1, which means that for every one pound invested London gets £4.70 back in economic benefits. Once these four lines have been completed, LU will then move on to introducing new trains and control systems for the Piccadilly, Central, Bakerloo, and Waterloo & City lines.

For more information on companies in this article

Related Content

  • New York's congestion charging scheme is finally underway
    January 6, 2025
    First US city to introduce such a scheme: drivers now pay $9 per day
  • US favours express buses are for intercity travel
    November 26, 2013
    David Crawford records an upsurge in ground travel. Express buses are powering ahead of air and rail as the US’ most-favoured form of intercity travel and major operators are investing in passenger-attracting and retaining technologies. At the same time ‘kayak’-style price comparison websites are emerging to widen rider choice. Modelled on airline industry search engines that find cheap flight deals by comparing carriers’ offers, these new websites aim to fill the same gap for a ground-travel equivalent
  • Safer Road Fund wins royal recognition
    December 1, 2021
    Road schemes designed to prevent 1,450 fatal and serious injuries over next 20 years
  • Impact of speed limits in Barcelona
    January 20, 2012
    When Barcelona imposed an 80km/h (50mph), the result was significant in environmental, accident, fatality and injury terms. The 80km/h speed limit had the same positive environmental effect as if 22,100 cars were eliminated from the roads in the metropolitan area. Moreover, a reduction in the consumption of fuel by more than 24,000 tonnes per year was also achieved, while accidents, fatalities and injuries also showed substantial improvement.