Skip to main content

Thales to supply signalling for Guangzhou metro

Thales, through its local joint venture Thales Saic Transportation, has been awarded the signalling contract for phase 1 of Guangzhou metro lines 14 and 21. Spanning around 138 kilometres in total, both lines will be equipped with Thales’ SelTrac CBTC rail signalling system. The two lines are designed to run with a combination of express and normal routes, which will significantly reduce journey times. Lines 14 and 21 are expected to be operational by the end of 2017. Based on a 100 per cent transfer
January 7, 2015 Read time: 1 min
Thales, through its local joint venture 596 Thales 6890 Saic Transportation, has been awarded the signalling contract for phase 1 of Guangzhou metro lines 14 and 21.

Spanning around 138 kilometres in total, both lines will be equipped with Thales’ SelTrac CBTC rail signalling system. The two lines are designed to run with a combination of express and normal routes, which will significantly reduce journey times. Lines 14 and 21 are expected to be operational by the end of 2017.

Based on a 100 per cent transfer of technology and innovation, Thales Saic Transportation has mastered the world-leading signalling technology and is optimising the system according to the operational needs of Chinese consumers.

For more information on companies in this article

Related Content

  • Integrating ferry transport into smart ticketing
    March 1, 2013
    Transport authorities are increasingly looking to integrate ferry travel into the mix of public transport. David Crawford finds out more. The new A$370m (US$398m) Opal public transport smartcard system being installed by the Cubic Transportation Systems (CTS)-led Pearl consortium in Sydney is geographically the largest in the world to date. The consortium includes the Commonwealth Bank of Australia; Australian retail payment system provider ePay; Australian infrastructure engineering company Downer Group; a
  • LA confirms $133m transit contracts
    April 5, 2021
    Sepulveda Transit Corridor Project includes rail and monorail solutions for busy road routes
  • Developing an integrated WIM/ANPR enforcement system
    July 31, 2012
    The weigh in motion market remains especially buoyant and technological development continues to reflect this. Although there are major differences in operating philosophies, particularly between developed and developing countries, both the numbers of countries using Weigh In Motion (WIM) technology and the numbers of systems that they deploy are on the increase.
  • Bogota's metro tender delayed
    July 25, 2014
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p