Skip to main content

Thales to supply communications systems for Hyderabad Metro Rail

Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w
December 11, 2012 Read time: 2 mins
596 Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations.

Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the world's largest cities metro systems, transporting 3 billion passengers each year.

The integrated communications and supervision systems supplied will build on the success of previous supervision projects in India in Delhi, Mumbai, Bangalore and Jaipur. Thales’ comprehensive ICS package includes data transmission, public address, passenger information display, fault reporting facilities, office automation and information technology, CCTV, access control and intrusion detection, master clock, telephony, voice recording and radio tetra systems.

The project will also include around 18.5 million square feet of Transit-Oriented Development (TOD) and is expected to trigger robust economic activity in and around the city and will generate substantial employment.  The systems will be deployed in six stages and will cover three key corridors: Miyapur to LB Nagar; Jubilee bus stand to Falaknuma; and Nagole to Shilparaman. Under the integrated coordination of a central control operations facility, trains will operate automatically, with an attendant on board.

“We are delighted to have secured the first CBTC project in India, as this is a landmark contract being the first of its kind in India,” said Eric Lenseigne, vice president, Thales India. “To also have been chosen for the supervision systems, already present for 10 years in the country, proves our strength in delivering complete and fully-integrated high-tech solutions for all aspects of urban railway projects. These key contracts reinforce Thales’ strong presence in high potential growth markets.”

For more information on companies in this article

Related Content

  • Yalla e-mobility for Aljada in UAE
    December 29, 2023
    Arada’s Yalla e-bikes and e-scooters are sustainable transport alternatives in Sharjah, UAE
  • German authorities use CB-radio message to reduce accidents in roadworks
    April 8, 2014
    Citizen Band radio is proving useful to prevent accidents in Germany’s roadworks. In common with other German Länder (federal regions) with large volumes of commercial vehicles using their trunk road networks, Bavaria had been experiencing high levels of road traffic accidents (RTAs) involving heavy trucks in the vicinity of minor motorway maintenance sites. This was despite the extensive visual warning regulations published in the German federal road safety audit (RSA) guidelines for the protection of site
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • 12th ITS Asia-Pacific Forum focuses on cooperation
    March 14, 2012
    In April this year, ITS Malaysia will host the 12th ITS Asia-Pacific Forum and Exhibition in Kuala Lumpur to further advance ITS cooperation and coordination between member countries in the region. In 1999, just a year after construction of the iconic Petronas Twin Towers was completed, Kuala Lumpur hosted the 3rd ITS Asia-Pacific Forum. A great deal has changed in the intervening 13 years, not least the scope and importance of the Forum’s programme. The 12th running of this event, being held from 16-18 Ap