Skip to main content

Thales Siemens JV wins Spanish high speed rail contract

Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
August 17, 2015 Read time: 2 mins
Spanish rail administrator Adif has awarded the 596 Thales and 189 Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months.

Siemens Rail Automation will be responsible for modernising the Trackguard Westrace technology electrical interlocking located at Chamartín station and its extension as far as the new southern head of Chamartín station. It will also undertake alterations to the centralised traffic centre (CTC) and provide its ASFA train protection system in the Atocha-Chamartín tunnel and on the track section up to Torrejón de Velasco. In addition, Siemens will install its Clearguard FS3000 line circuits along with LED signals and associated cabling and will carry out auxiliary civil engineering works as well as the construction of a technical building in Chamartín.

Thales will take responsibility for extending and adapting the existing level 1 and level 2 ERTMS protection system in Chamartín station, including the modification of two control centres. It will also provide LockTrac electronic interlockings, ERMTS L1 AlTrac train protection equipment, security systems (CCTV) and fixed telecommunications to the Chamartín and Torrejón de Velasco section to facilitate the circulation of trains. Thales will also extend the train traffic control and protection facilities at the Torrejón de Velasco junction, Madrid-Seville high-speed line, with the necessary technology for the link with the new line. It will also adapt the CTC on the Madrid-Seville high-speed line.

For more information on companies in this article

Related Content

  • Kapsch connecting in Spanish corridor
    October 31, 2024
    57km stretch is on the A8 highway near Bilbao in north of country
  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s
  • Traffic Data Systems wins Hamburg bridge WiM deal
    March 20, 2025
    Köhlbrand Bridge across River Elbe is second-longest in Germany
  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag