Skip to main content

Thales Siemens JV wins Spanish high speed rail contract

Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
August 17, 2015 Read time: 2 mins
Spanish rail administrator Adif has awarded the 596 Thales and 189 Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months.

Siemens Rail Automation will be responsible for modernising the Trackguard Westrace technology electrical interlocking located at Chamartín station and its extension as far as the new southern head of Chamartín station. It will also undertake alterations to the centralised traffic centre (CTC) and provide its ASFA train protection system in the Atocha-Chamartín tunnel and on the track section up to Torrejón de Velasco. In addition, Siemens will install its Clearguard FS3000 line circuits along with LED signals and associated cabling and will carry out auxiliary civil engineering works as well as the construction of a technical building in Chamartín.

Thales will take responsibility for extending and adapting the existing level 1 and level 2 ERTMS protection system in Chamartín station, including the modification of two control centres. It will also provide LockTrac electronic interlockings, ERMTS L1 AlTrac train protection equipment, security systems (CCTV) and fixed telecommunications to the Chamartín and Torrejón de Velasco section to facilitate the circulation of trains. Thales will also extend the train traffic control and protection facilities at the Torrejón de Velasco junction, Madrid-Seville high-speed line, with the necessary technology for the link with the new line. It will also adapt the CTC on the Madrid-Seville high-speed line.

For more information on companies in this article

Related Content

  • Developments in signal head lens technology
    February 3, 2012
    Heads and tails Leading manufacturers of traffic signal systems discuss developments in signal head technology as well as some of the legacy issues which affect future deployments Transparent model of Dambach's ACTROS.line technology, showing the bus electronics in the signal head Cowls could be superseded by the greater use of lens technology
  • Siemens to modernise Northamptonshire traffic systems
    August 23, 2012
    An extensive programme to upgrade Northampton County Council's current traffic systems is about to get underway. Siemens will initially provide Northamptonshire in the UK with the latest PC SCOOT UTC system and replace the existing Prefect system with the company’s recently launched InView hosted fault management solution. Subsequent phases will see the swapping out of all existing analogue TC12 outstations for the latest Siemens UTMC compliant UG405 outstations and ultimately the migration to a new hosted
  • Moxa technology helps to speed up troubleshooting
    October 8, 2015
    Moxa is giving operators such as transit authorities the chance to speed up troubleshooting of their traffic signalling and CCTV systems by allowing them to modify existing infrastructure rather than having to lay new cables. This will allow them to improve urban mobility, reducing system downtime and lowering costs, the company says.
  • Truvelo TRIMMS night-time speeds on unlit roads
    June 5, 2014
    Truvelo UK’s new TRIMMS infrared illumination enables mobile speed enforcement in the dead of night. Lincolnshire is the UK’s fourth-largest county, has a population of over a million and is predominantly rural. Only 66km of its 8,893km road network is dual carriageway and 79% of the rest is ‘C’ class or unclassified roads. In terms of Killed and Seriously Injured (KSI) figures, there were 415 casualties in 2013 (down from 526 in 2002). Official figures show inappropriate speed accounts for 25% of the UK’s