Skip to main content

Thales Siemens JV wins Spanish high speed rail contract

Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
August 17, 2015 Read time: 2 mins
Spanish rail administrator Adif has awarded the 596 Thales and 189 Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months.

Siemens Rail Automation will be responsible for modernising the Trackguard Westrace technology electrical interlocking located at Chamartín station and its extension as far as the new southern head of Chamartín station. It will also undertake alterations to the centralised traffic centre (CTC) and provide its ASFA train protection system in the Atocha-Chamartín tunnel and on the track section up to Torrejón de Velasco. In addition, Siemens will install its Clearguard FS3000 line circuits along with LED signals and associated cabling and will carry out auxiliary civil engineering works as well as the construction of a technical building in Chamartín.

Thales will take responsibility for extending and adapting the existing level 1 and level 2 ERTMS protection system in Chamartín station, including the modification of two control centres. It will also provide LockTrac electronic interlockings, ERMTS L1 AlTrac train protection equipment, security systems (CCTV) and fixed telecommunications to the Chamartín and Torrejón de Velasco section to facilitate the circulation of trains. Thales will also extend the train traffic control and protection facilities at the Torrejón de Velasco junction, Madrid-Seville high-speed line, with the necessary technology for the link with the new line. It will also adapt the CTC on the Madrid-Seville high-speed line.

For more information on companies in this article

Related Content

  • Flagship French motorway inaugurated
    April 16, 2014
    The inauguration of the French Landes A63 motorway marked the culmination of 27 months of major works carried out adjacent to traffic by the economic interest group GIE A63. The road concessionaire, Atlandes, of which Egis is a shareholder, had awarded the construction contract to GIE A63, which then hired Egis for the turnkey integration of fixed and operational equipment and an 80 per cent share of the engineering, procurement and construction management. Atlandes also awarded Egis the subsequent operati
  • Indra to implement control centre for Kuala Lumpur LRT and monorail
    July 9, 2013
    Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is
  • Parsons JV lands contract with San Francisco BART
    October 20, 2014
    Engineering group Parsons, in a joint venture with Acumen (APJV), has been selected to provide general engineering services (GES) to the San Francisco Bay Area Rapid Transit District (BART) over the next five years. The APJV team, composed of 11 sub-consultants, will deliver top-flight services in an array of technical disciplines, including architectural, civil, structural, mechanical, electrical, and systems project work. The team’s selection sends a clear signal to the community that BART is committed