Skip to main content

Thales Siemens JV wins Spanish high speed rail contract

Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
August 17, 2015 Read time: 2 mins
Spanish rail administrator Adif has awarded the 596 Thales and 189 Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months.

Siemens Rail Automation will be responsible for modernising the Trackguard Westrace technology electrical interlocking located at Chamartín station and its extension as far as the new southern head of Chamartín station. It will also undertake alterations to the centralised traffic centre (CTC) and provide its ASFA train protection system in the Atocha-Chamartín tunnel and on the track section up to Torrejón de Velasco. In addition, Siemens will install its Clearguard FS3000 line circuits along with LED signals and associated cabling and will carry out auxiliary civil engineering works as well as the construction of a technical building in Chamartín.

Thales will take responsibility for extending and adapting the existing level 1 and level 2 ERTMS protection system in Chamartín station, including the modification of two control centres. It will also provide LockTrac electronic interlockings, ERMTS L1 AlTrac train protection equipment, security systems (CCTV) and fixed telecommunications to the Chamartín and Torrejón de Velasco section to facilitate the circulation of trains. Thales will also extend the train traffic control and protection facilities at the Torrejón de Velasco junction, Madrid-Seville high-speed line, with the necessary technology for the link with the new line. It will also adapt the CTC on the Madrid-Seville high-speed line.

For more information on companies in this article

Related Content

  • Turkey turnkey tunnel deal for Siemens
    April 20, 2012
    Turkey's General Directorate of Highways (KGM or Karayollari Genel Müdürlügü), is ordering power, lighting and ventilation equipment from Siemens for a major tunnel project. The Dorukhan Tunnel linking Mengen and Devrek will be equipped with the package from Siemens, which includes associated safety and communications systems. The size of the deal has not been released and the handover of the new system is scheduled for January 2012.
  • Heart of Slough implements Siemens wireless traffic detection
    February 21, 2013
    As part of the Heart of Slough improvement project, new traffic intersections across seven key sites in and around Slough, UK have been equipped with a total of 162 Siemens WiMag wireless magnetometer sensors by Siemens to help improve the management of traffic using the A4 and travelling to and from the town centre. Complementing the company’s proven loop and radar detection solutions, the sensors provide the Heart of Slough project with an alternative traffic detection system that uses magnetic disturbanc
  • Vinci wins contract for light railway project in Qatar
    April 18, 2012
    QDVC, a joint venture between Qatari Diar and French group Vinci has won the contract for the new phase of work in the light railway development in the Qatari town of Lusail near Doha. The contract, worth US$536.67 mllion, and covers civil engineering work on eight underground stations, the construction of a viaduct crossing a motorway and preliminary work on a light rail transport depot and maintenance workshop. The project is expected to take 38 months to complete.
  • Siemens to electrify metro lines in Peru
    January 25, 2016
    Siemens has been awarded a contract by Ansaldo STS to electrify the new double-track metro line 2 in Peru’s capital city, Lima, as well as the eight kilometre-long first phase of line 4 in the city. The two new metro lines will connect additional city districts and the international airport to the capital's mass transit network. The contract also includes the simultaneous extension of line 2 to the airport, the first phase of the future line 4. The project includes six feeder stations, two 20 kV cable