Skip to main content

Thales Siemens JV wins Spanish high speed rail contract

Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
August 17, 2015 Read time: 2 mins
Spanish rail administrator Adif has awarded the 596 Thales and 189 Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months.

Siemens Rail Automation will be responsible for modernising the Trackguard Westrace technology electrical interlocking located at Chamartín station and its extension as far as the new southern head of Chamartín station. It will also undertake alterations to the centralised traffic centre (CTC) and provide its ASFA train protection system in the Atocha-Chamartín tunnel and on the track section up to Torrejón de Velasco. In addition, Siemens will install its Clearguard FS3000 line circuits along with LED signals and associated cabling and will carry out auxiliary civil engineering works as well as the construction of a technical building in Chamartín.

Thales will take responsibility for extending and adapting the existing level 1 and level 2 ERTMS protection system in Chamartín station, including the modification of two control centres. It will also provide LockTrac electronic interlockings, ERMTS L1 AlTrac train protection equipment, security systems (CCTV) and fixed telecommunications to the Chamartín and Torrejón de Velasco section to facilitate the circulation of trains. Thales will also extend the train traffic control and protection facilities at the Torrejón de Velasco junction, Madrid-Seville high-speed line, with the necessary technology for the link with the new line. It will also adapt the CTC on the Madrid-Seville high-speed line.

For more information on companies in this article

Related Content

  • Cellular coverage on trains to get boost
    October 2, 2013
    According to Ingo Flomer, director of Product Management of UK company Axell Wireless, UK transport secretary Patrick McLoughlin’s intention to upgrade the rail network to enable passengers to access high-speed mobile broadband does not go far enough to promote an integrated communications infrastructure that supports cellular (3G and 4G) coverage on-board trains. Flomer says the UK has significant technological hurdles to overcome to connect rail passengers to the cellular network. The coverage would ha
  • Siemens delivers pedestrian countdown at traffic signals
    November 30, 2015
    First shown at Traffex 2015 in April, production of Siemens’ new Pedestrian Countdown at Traffic Signals (PCaTS) is now fully under way. PCaTS informs pedestrians how long they have to cross the road after the far-side green man signal has gone out. By providing a visible countdown of the time remaining before the appearance of the red man, PCaTS is intended to give pedestrians a better understanding of the time available to complete crossing, reducing anxiety once the green man is no longer displayed. B
  • Thales awarded signalling contract for Brazil metro
    March 25, 2014
    Thales has been selected by metro operator CCR Metrô Bahia to provide a signalling solution for lines 1 and 2 of the new metro in Salvador, Brazil’s third largest city. Thales will deliver its world leading SelTrac communications-based train control (CBTC) signalling solution, providing fully automatic driverless operation. Lines 1 and 2 cover a combined distance of 31 kilometres and serve 19 stations. The new metro will be part of an integrated transportation system, serving Luiz Eduardo Magalhães
  • Thales awarded signalling contract for Brazil metro
    March 25, 2014
    Thales has been selected by metro operator CCR Metrô Bahia to provide a signalling solution for lines 1 and 2 of the new metro in Salvador, Brazil’s third largest city. Thales will deliver its world leading SelTrac communications-based train control (CBTC) signalling solution, providing fully automatic driverless operation. Lines 1 and 2 cover a combined distance of 31 kilometres and serve 19 stations. The new metro will be part of an integrated transportation system, serving Luiz Eduardo Magalhães