Skip to main content

Thales record Korea deployment

Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales
May 29, 2012 Read time: 2 mins
596 Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012.

The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February  after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales to upgrade the Jeolla Line with ETCS Level 1 equipment. With 25 stations over a total length of 89 km, the work needed to be completed to an ambitious schedule of just seven months in time for Expo 2012, which opened in Yeosu in May.

Thales and its local industry partners were able to manufacture a substantial share of the ETCS Level 1 equipment in South Korea, increasing local added value and boosting overall programme performance.

For more information on companies in this article

Related Content

  • Olympic challenges in Sochi
    May 27, 2014
    Sporting events always create problems for traffic planners and none more so than the Winter Olympics. It is difficult to think of more diametrically opposite challenges for transport planners than the 2012 Olympics in London and this year’s Winter Olympics in Sochi: from a summer event in the heart of a megacity with well established transport infrastructure to winter games with unpredictable weather and events in remote and mountainous locations. The Winter Games are always a challenge and Sochi was no di
  • Report urges US$25 billion transport improvement plan
    August 6, 2014
    The One North report, produced by the city regions of Leeds, Liverpool, Manchester, Newcastle and Sheffield in the UK, puts forward a strategic proposition for transport in the north of the country. The US$16.8-US$25.2 billion plan urges major changes in connectivity and capacity between the northern cities over the next 15 years and proposes optimisation of strategic highway capacity, a new high speed trans-Pennine rail route and improved city region rail networks interconnected with HS2 services, new inte
  • Innovative traffic information system
    January 31, 2012
    From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone
  • Fleet tracking system delivers cost and customer benefits
    May 22, 2012
    Introduction of a fleet tracking system has provided expected headline benefits. But it is the intangibles that have been most valuable Crescent Electric Supply Company (CESC) was founded in 1919 and is one of the largest independent distributors of electrical hardware and supplies in the US. Based in East Dubuque, Illinois, the company has 120 distribution facilities in 27 states, serving contractors, original equipment manufacturers (OEM) and the maintenance, repair and operations (MRO) needs of commercia