Skip to main content

Thales record Korea deployment

Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales
May 29, 2012 Read time: 2 mins
596 Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012.

The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February  after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales to upgrade the Jeolla Line with ETCS Level 1 equipment. With 25 stations over a total length of 89 km, the work needed to be completed to an ambitious schedule of just seven months in time for Expo 2012, which opened in Yeosu in May.

Thales and its local industry partners were able to manufacture a substantial share of the ETCS Level 1 equipment in South Korea, increasing local added value and boosting overall programme performance.

For more information on companies in this article

Related Content

  • Inrix informs FHWA’s data improvements
    December 19, 2017
    Refinements in the data available from the US Federal Highway Administration will improve road management across America. David Crawford reports. In August 2017, the US Federal Highway Administration (FHWA) issued the first results from an upgraded version of its National Performance Management Research Data Set (NPMRDS). Developed to identify the locations and times of high congestion affecting traffic flows along America’s 259,000km (161,000 mile) national highway system, this is a key resource for sta
  • Gotthard Base Tunnel opens in Switzerland
    June 1, 2016
    After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • Hard shoulder running aids uniform traffic flow and safer driving
    January 23, 2012
    David Crawford detects a market for European experience. Well-established now in at least three European countries, Hard Shoulder Running (HSR) on motorways is exciting growing interest in the US. A November 2010 Report to Congress by the Federal Highway Administration (FHWA), on the Efficient Use of Highway Capacity, notes the role of HSR in the European-style Active Traffic Management (ATM) strategies now being recommended for implementation in the US where, until recently, they were virtually unknown.