Skip to main content

Thales record Korea deployment

Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales
May 29, 2012 Read time: 2 mins
596 Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012.

The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February  after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales to upgrade the Jeolla Line with ETCS Level 1 equipment. With 25 stations over a total length of 89 km, the work needed to be completed to an ambitious schedule of just seven months in time for Expo 2012, which opened in Yeosu in May.

Thales and its local industry partners were able to manufacture a substantial share of the ETCS Level 1 equipment in South Korea, increasing local added value and boosting overall programme performance.

For more information on companies in this article

Related Content

  • On a WIM – a global view of weigh in motion
    May 25, 2016
    Q-Free’s Andrew Lees looks at regional characteristics and technology trends in the global Weigh-In-Motion market. The principles of Weigh-In-Motion (WIM) are well established. Data derived from vehicles passing over in-ground sensors can be interpreted for vehicle classification (axle counts and spacing) and positive identification (especially when linked to image capture) applications as well as to derive individual axle and gross vehicle weight (GVW).
  • Indra wins in India with two transport and traffic contracts
    November 30, 2015
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with
  • French consortium to build Line 3 of Hanoi metro
    February 21, 2017
    International technology company Thales, as part of a French consortium including Alstom and Colas Rail, is to provide a complete telecommunications system for Line 3 of the Hanoi metro, the first of five lines planned for the Vietnamese capital. Hanoi’s metro project plays a crucial role in relieving congestion and improving road safety for the city’s 7.5 million inhabitants. Under the urban transport master plan adopted by the city several years ago, five metro lines are due to be built by 2030. Th
  • Mobility as a Service gaining traction in US and Europe
    December 15, 2015
    As Mobility as a Service starts to move into the mainstream of transport planning, David Crawford compares European and North American initiatives. Mobility as a Service (MaaS) is a concept fast gaining traction on both sides of the Atlantic as a way of giving travellers digital multimodal one-stop shops and journey planning tools as an alternative to private car use. Planned delivery methods include subscription-based travel packages in Europe, and 'mobility aggregator' apps, including employee commute ben