Skip to main content

Thales record Korea deployment

Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales
May 29, 2012 Read time: 2 mins
596 Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012.

The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February  after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales to upgrade the Jeolla Line with ETCS Level 1 equipment. With 25 stations over a total length of 89 km, the work needed to be completed to an ambitious schedule of just seven months in time for Expo 2012, which opened in Yeosu in May.

Thales and its local industry partners were able to manufacture a substantial share of the ETCS Level 1 equipment in South Korea, increasing local added value and boosting overall programme performance.

For more information on companies in this article

Related Content

  • Brooklyn eyes Bogota’s BRT system
    June 17, 2016
    David Crawford considers the increased interest in bus rapid transit and looks that the latest trends. Bus rapid transit (BRT) is gaining an increasingly high profile in the US public transport agenda, for two main reasons. One is the potential for ‘trains on wheels’ to save substantially on installation costs as compared with other modes such as underground metros or light-rail transit. Another, highlighted in the case of New York City, is the value of having a rapid surface-based alternative available whe
  • Siemens to equip new metro line in Sofia
    March 30, 2016
    Metropolitan EAD, the metro operator in Sofia, Bulgaria, has commissioned a consortium of Siemens and the Polish train manufacturer Newag to equip the new metro line 3 in the city, which will create an 18 kilometre east-west link that will serve 18 stations. The order, valued at around US$158 million (EUR140 million), comprises the delivery of 20 Inspiro type metro trains and the Trainguard MT automatic train protection system, using wireless CBTC technology (communications-based train control) to provid
  • High-speed WIM moves onto the main highway
    May 24, 2016
    High-speed weigh-in-motion is starting to make its mark on both sides of the Atlantic. As a transit country the Czech Republic experiences a large number of overloaded vehicles, which greatly increase highway maintenance costs. This prompted its Transport Ministry to trial an extension of the capabilities of the existing truck tolling system to allow the dynamic high-speed weighing of cargo vehicles. In effect the tolling enforcement gantries become weigh-in-motion (WIM) locations.
  • Singapore upgrading MRT for better reliability
    May 9, 2012
    Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator SMRT.