Skip to main content

Thales to modernise Egyptian railways signalling systems

In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the
May 29, 2013 Read time: 2 mins
In a contract valued at over US$141 million with Egyptian National Railways, 596 Thales is to modernise the signalling systems on the Cairo-Alexandria corridor.

The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year.

The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the telecommunication system and centralised traffic control. The Thales signalling solution will enhance the safety and the capacity of the line, allowing an expected 32 million passengers to use it every year. The new system will allow trains to increase in speed from speeds, and will reduce the headway between trains from ten to five minutes. The construction will take four years.

“We are delighted to have won this important contract. It is the first step of the ambitious renovation programme for the signalling system launched by the Ministry of Transport and the Egyptian National Railways network. The contract fits in with the long term strategy of modernising the railway infrastructure,” said Michelangelo Neri, Thales country director in Egypt.

For more information on companies in this article

Related Content

  • Robust growth for Sensys
    August 21, 2014
    Orders from the Swedish Transport Administration (STA -Trafikverket) have contributed to Sensys Traffic’s net sales in the second quarter of 2014, which rose by 127 per cent. This robust growth was primarily fuelled by speed measurement system deliveries to the Swedish automatic safety control (ATC) stations. The orders, for monitoring systems, roadside cabinets and spare parts for speed enforcement enabled the company to deliver an operating profit of US$970,000. The company’s gross margin for the quart
  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • Thales to supply signalling for Guangzhou metro
    January 7, 2015
    Thales, through its local joint venture Thales Saic Transportation, has been awarded the signalling contract for phase 1 of Guangzhou metro lines 14 and 21. Spanning around 138 kilometres in total, both lines will be equipped with Thales’ SelTrac CBTC rail signalling system. The two lines are designed to run with a combination of express and normal routes, which will significantly reduce journey times. Lines 14 and 21 are expected to be operational by the end of 2017. Based on a 100 per cent transfer