Skip to main content

Thales to modernise Egyptian railways signalling systems

In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the
May 29, 2013 Read time: 2 mins
In a contract valued at over US$141 million with Egyptian National Railways, 596 Thales is to modernise the signalling systems on the Cairo-Alexandria corridor.

The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year.

The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the telecommunication system and centralised traffic control. The Thales signalling solution will enhance the safety and the capacity of the line, allowing an expected 32 million passengers to use it every year. The new system will allow trains to increase in speed from speeds, and will reduce the headway between trains from ten to five minutes. The construction will take four years.

“We are delighted to have won this important contract. It is the first step of the ambitious renovation programme for the signalling system launched by the Ministry of Transport and the Egyptian National Railways network. The contract fits in with the long term strategy of modernising the railway infrastructure,” said Michelangelo Neri, Thales country director in Egypt.

For more information on companies in this article

Related Content

  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • Active traffic management increases safety and capacity
    February 2, 2012
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates
  • Consortium wins Mexico rail project
    November 27, 2014
    A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency