Skip to main content

Thales installs signalling technology for Ottawa line extension

Thales is to provide its SelTrac Communications Based Train Control (CBTC) system for the City of Ottawa’s Stage 2 O-Train Confederation Line Extension project in Canada. Thales says the line will take 780,000 annual rush-hour bus trips off the road and will carry up to 24,000 customers per hour. Once complete, it will run from Trim Road and west to Baseline Road and Moodie Drive across 29 stations spanning a distance of 40km. The CBTC moves block signalling technologies to actively manage the track in r
June 26, 2019 Read time: 2 mins

596 Thales is to provide its SelTrac Communications Based Train Control (CBTC) system for the City of Ottawa’s Stage 2 O-Train Confederation Line Extension project in Canada.

Thales says the line will take 780,000 annual rush-hour bus trips off the road and will carry up to 24,000 customers per hour. Once complete, it will run from Trim Road and west to Baseline Road and Moodie Drive across 29 stations spanning a distance of 40km.

The CBTC moves block signalling technologies to actively manage the track in real-time by providing the location and speed of trains while maintaining communications with all parts of the system, the company adds.

According to Thales, this increases the line’s efficiency by allowing the system to run trains closer together while maintaining safe operating distances.

As part of the deal, Thales will integrate control units on each train and install guideway equipment, including zone controllers.

For more information on companies in this article

Related Content

  • Benefits of traffic light synchronisation
    January 27, 2012
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Alstom consortiums awarded contracts for Cairo metro line 3
    March 10, 2015
    Alstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million. Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operationa
  • Spreading the word about Bike Share in the US
    April 19, 2016
    Smart bike share technology and funding policies help bridge the transit gap through the final mile as Andrew Bardin Williams explains. The sharing economy is coming to Portland this summer. BikeTown, the city’s new bike share program sponsored by Nike, will be launched in mid-July with 1,000 bicycles distributed across 100 stations throughout the city. Originally funded by a $2 million federal grant, the program has been boosted by a $10 million sponsorship deal with Nike ensures funding for the next five