Skip to main content

Thales to implement traffic control system on Spanish rail line

Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved
October 7, 2015 Read time: 1 min
Spanish railway infrastructure administrator Adif has awarded 596 Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months.

The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved as a result of this project, given that it adapts the line to the requirements for electrified lines and provides for the possible introduction of three rails.

Related Content

  • April 17, 2012
    Thales delivers ATO system for the Mecca metro
    Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
  • March 27, 2012
    Thales awarded first metro signalling contract in Brazil
    Thales has been selected by Andrade Gutierrez (AG) and CR Almeida to deliver its SelTrac communications-based train control (CBTC) signalling solution for Line 17 of the São Paulo metro. The new line will be driverless and fully automatic. The first phase of implementation is planned to support the 2014 FIFA World Cup, with completion scheduled for August 2014, a record delivery time of just 27 months. The new 18km elevated line will be built by a consortium led by Andrade Gutierrez (AG) and including CR Al
  • October 20, 2015
    Thales consortium to provide systems for Panama metro line 2
    A consortium comprising Thales Alstom, CIM, Sofratesa, and TSO by Consórcio Línea 2 (Odebrecht and FCC) has been awarded a US$ 568 million contract for the provision of an integrated metro system for line 2 of the Panama metro network. Thales will deliver its transportation solutions in telecommunication, passenger services, security and supervision systems. Scheduled to begin in 2019, line 2 will be 21 km long and include 16 stations. It will interconnect with line 1, inaugurated in 2014 and for whic
  • October 31, 2024
    Kapsch connecting in Spanish corridor
    57km stretch is on the A8 highway near Bilbao in north of country