Skip to main content

Thales to implement traffic control system on Spanish rail line

Spanish railway infrastructure administrator Adif has awarded Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months. The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved
October 7, 2015 Read time: 1 min
Spanish railway infrastructure administrator Adif has awarded 596 Thales a US$22 million contract for the deployment of a traffic control system and the improvement of security and communications on the 57.4 km Algeciras-Gaucín railway section in Spain. The project is expected be completed in 18 months.

The improvements are expected to improve line capacity and traffic flow consistency, in addition to improving security and communications. Further integration into the Mediterranean Corridor could be achieved as a result of this project, given that it adapts the line to the requirements for electrified lines and provides for the possible introduction of three rails.

Related Content

  • February 27, 2013
    Consortium wins Polish rail modernisation contract
    A consortium led by Bombardier Transportation in partnership with Thales and Nokia Siemens Networks has won the US$146 million contract to modernise the signalling of the 350 km long E65 railway line linking Warsaw and Gdynia. The need to comply with the standards of the trans-European transport network linking the north and south of Europe makes the contract is one of the most important investments of PKP, the Polish railway lines operator. The consortium claims the modernisation will enhance safety and in
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • December 18, 2015
    Thales to upgrade Greater Cairo Metro
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • September 29, 2020
    SkyTrain signals more work for Thales
    Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system