Skip to main content

Thales deploys the first ETCS Level 2 system in Hungary

Thales and its consortium partner, the Hungarian company Dunántúli Kft., has signed a contract worth over US$91 million with the Hungarian infrastructure company NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.
March 23, 2012 Read time: 1 min

596 Thales and its consortium partner, the Hungarian company 4237 Dunántúli Kft, has signed a contract worth over US$91 million with the Hungarian infrastructure company 4238 NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.

Six years after having completed the first European cross-border ETCS project on the line between Vienna and Budapest, the latest project includes the design, delivery, installation and commissioning of Elektra electronic interlocking systems for five train stations, an operational management centre at Püspükladány station and an ETCS level 2 Radio Block Centre. Around 180 points and 340 signals are controlled by the operational management centre. The project is scheduled to be completed by the end of 2015.

Related Content

  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Q-Free preparing for new projects
    April 27, 2012
    Q-Free has announced revenues of US$21.11 million during the first quarter 2012 compared to US$29.66 million in the corresponding quarter in 2011, while order intake came in at $44.29 million, $6.45 million more than in previous quarter and $2.96 million more than in Q1-2011, reflecting, the company says, that its general optimism regarding demand is well grounded.
  • Keeping people on track is RATP’s raison d’etre
    June 14, 2018
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule
  • Harmonisation of Europe's ITS deployment still unbalanced
    January 31, 2012
    Dean Herenda, Chairman of the EasyWay project, talks about the progress made and the progress still to be made in harmonising ITS deployment across the European Union. "The deployment and use of ITS in road transport across Europe was and still is unbalanced" Although Europe can be proud of being home to some of the world's most advanced ITS solutions, the relative disparities between Member States of the European Union (EU) in terms of the extent and technological sophistication of deployments actually sta