Skip to main content

Thales deploys the first ETCS Level 2 system in Hungary

Thales and its consortium partner, the Hungarian company Dunántúli Kft., has signed a contract worth over US$91 million with the Hungarian infrastructure company NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.
March 23, 2012 Read time: 1 min

596 Thales and its consortium partner, the Hungarian company 4237 Dunántúli Kft, has signed a contract worth over US$91 million with the Hungarian infrastructure company 4238 NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.

Six years after having completed the first European cross-border ETCS project on the line between Vienna and Budapest, the latest project includes the design, delivery, installation and commissioning of Elektra electronic interlocking systems for five train stations, an operational management centre at Püspükladány station and an ETCS level 2 Radio Block Centre. Around 180 points and 340 signals are controlled by the operational management centre. The project is scheduled to be completed by the end of 2015.

Related Content

  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • High speed rail signalling system contract win for Hollysys
    January 9, 2013
    In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h. Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected
  • Huawei's ORT tech removes highway toll gates
    August 26, 2020
    Road tolling operations will be transformed by new revenue collection possibilities
  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne